Skills:
Experience in solving complex technical problems in a systematic way (UL & BS Systems).
Prepare and deliver executive-level preparations.
Strong Consulting, teamwork, customer integrity, and assessment skills.
Strong time, project management, and multi-tasking skills.
Ability to conceptually adapt technologies to fix various ideas.
Presentation & communication skills.
Estimation & commercial negotiation.
Planning & coordination.
MS Office, Auto cad.
Excellent team worker and problem-solving technique.
Additionally:
Installation of fire-stopping applications for mechanical, electrical, and plumbing works.
Capable of working on UL standards and Fire Break, HILTI,3M, STI, and Fischer designs such as engineering judgment (EJ).
Taking off BOQs and preparing the quotation as per the IFC drawings.
Checking of IFC drawings and preparation of shop drawings for MEP work as per project specifications and standards.
Preparing the Material Submittals (MAS) as per Project Specifications and standards, & also updating at the time of As-built Drawing preparation.
Preparation of Compliance statement of various materials by comparing project specification and supplier material specification for making MAS to be approved.
Preparation of Method Statement of various activities included in the project.
Rising Material Requisition and coordinating with the purchasing department, Material follow-up with the Supplier
Coordinating with Quantity Surveyor (QS) for interim payment applications and cost variation.
Raising Material Inspection Requests (MIR)& making them approved by coordinating with consultants and clients.
Raising of Request for inspection (RFI) & making it approved by coordinating with the Consultant and client.
Fully familiar with the installation and testing commissioning of HVAC systems (AHU, FCU, CRAC UNIT, Air-cooled Chillers, pre-insulated piping, Package units, cassette AC and Ducting, jet axial fan, cooling tower, heat exchangers.)
Firefighting system (sprinkler, firefighting Pumps, Zone control valve, firefighting piping, FHC, alarm check valves, Breeching inlet, Fire hydrant).
Installation of the plumping system (cold water system, hot water system, drainage, and pump (lifting station pump, Booster, transfer pump), GRP water tanks,
Supervision of testing and commissioning of all mechanical works completion of installation.
Daily work is allocated to foremen and charge hand as per schedule planning and the same reports to the project manager.
Estimate, prepare, and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for all Mechanical and related works before execution.
Attending project Review meetings (PRM) to report a technical issue.
Preparation of Monthly DPR & Reporting to the Project Manager & General Manager
Preparation of monthly Stock Statements and sending store department.
Reduce the wastage of material and increase manpower productivity
Coordinating with the consultant and client and resolving all technical problems in the facility.
Scheduled project line and ensured that project was completed on time.
Carryout the given target of work as much as possible according to my best
Ensuring that the work is completed following the specified QA/QC system and in a safe manner.
Preparation of Operation and maintenance manual (O&M) as per project standard and submitting for approval to Consultant and client.
Preparation of Red inline drawing and asbuilt drawing as per project specification and standard.
Preparing a list of equipment, skilled and unskilled manpower requirements, and assisting the planning engineer in preparing manpower histogram, project schedule, etc… (wherever applicable based on the project)
Ensure that all mechanical installations comply with the approved contract documents and specifications.
Performs any other related duties as assigned by the manager
Supervised the job and maintained the quality as per project specifications.
Able to train and handle people at work, familiar with quality standards and procedures.
Well-oriented in construction safety and Loss Prevention Implementation.
Implementation of quality control procedures and ensures that the HSE policies are strictly enforced.
Request for Inspection/Survey Check Form (RISC), checklists, and reporting formats and maintain them during the project.
Ensure that all inspections and tests are carried out as indicated on the appropriate Inspection & Test Plan (ITP).
Coordinate with QC inspectors, monitor and record inspection as made in the Inspection and test plan.
Interpret codes, Standards, and Project specifications to clarify elements to ensure understanding and ensure contract requirements are being met.
Coordinate with the Project Manager for third-party inspections.
Do the daily & weekly progress meetings with site supervisors & foremen within the firm.
Attend the daily, Weekly & monthly meetings with clients to discuss the construction & progress issues