Education:
2006 - Aug to 2007Aug Diploma in Computer Networks
A+ {Hardware maintenance}
N+ {Networking}
Windows XP Server 2003
2007 Dec HUAWEI TRAINING COLLEGE (KENYA)
Radio Base Station Installations and Commissioning (3GSM, HF, VHF Frequencies)
-
- Equipment Installation
- GSM principals
- Antenna installation
- Transmission principal and fundamentals
- Equipment mounting and protection
- Installation of e1, fiber & Ethernet termination
- Power termination
- Grounding of Equipment
- Feeder terminations & grounding
2008 Jan WANANCHI ONLINE TRAINING
WIMAX RADIO BASICS
-Comms Tower /Mast Installations
-Wimax principals
- Radio installation and Troubleshooting
- Grounding and protection measures
- Radio upgrading and configuration
2009 April- hybrid fiber coaxial training
Certified society of cable telecommunication engineer (scte)
- Planning Installations
- Drop cable installations
- Antenna Installations.
- Underground installations.
- Earthing and Protection grounding.
- PREING EG.MDUs AND SFUs.
- Safety and Standards
2009 Aug Kplc training school
Safety course for cable tv installation operations on power lines
course contents.
- basic electrical principles.
-general electrical safety.
-safety clearances for low and high voltage cables.
-operational safety.
-pole climbing and accessibility.
-first aid and rescue procedures.
-legal provisions in safety.
-practical field demonstrations
Skills:
April 2015- 2024 AZIZTECH limited - Somalia
- Site survey, Documentations,
-Communications Tower/Mast Installations
- Wireless Communication Radio Installations, VHF, HF, TETRA
-Tower foundations Designs and Constructions
-Vehicle mobile mountings
- Mobile radio repair maintenance
-LAN and WAN Installations
December2002
Packsteam Communication systems,
IT and Communication Technician
VOOM NETWORKS LTD
(Wanaichi Installation Contractor)
Installation Team Leader
- Wimax Base station Installation and commissioning
- Installation of Ethernet switches
- Installation of cabinet switches powering and protection Grounding
- RF Cable techniques feeders, RG,UTP,STP and fiber
- Installation of wireless radio, wimax µwave eg.Telsima, Redline, Alvarion eg.VL, Walkair etc.
- Radio VHF,HF software configuration and client IP configuration.
- Wananchi online migration [Alvarion –Telsima]
- Uu-net new radio installation and maintenance.
- Site survey at client site and Installation plan.
- Team mobilization and coordination
Nov 2007
WorldCom Engineering ltd
IT and Telecommunication Technician
- Curry out site survey and Audit
- Installation of Safaricom 2 G and 3G networks
- Installation Safaricom indoor netwoks
- Lead team and Coordinate projectsEquipment Dc power termination both HUAWEI & ERICSSON
- BTS and EVDO expansion in Western, Nyanza, Riftvalley, Nairobi & Central provinces.
- RF Cable techniques feeders, RG,UTP,STP and fiber
- Installation of InterMsc switches at QOA.SAFARICOM/ HUAWEI.
- Installation of UMTS RNC at QOA SAFARICOM HUAWEI
- Installation of InterMsc switches at QOA.SAFARICOM/ HUAWEI.
- Installation of UMTS RNC at QOA SAFARICOM HUAWEI
- OSN installation at QOA Nairobi Msr 1Mombasa Government Chemist 1
- Termination & jumpering well and earth -rods wired well inside the earth pit
- check and test the whole grounding systems
- Supervision of quality checks on equipment rooms and of towers
- of DDF.SAFARICOM &TELCOM KENYA.
- Termination of connectors eg BNC,RJ45
- Installation of SMSc switch for GSM .Orange Telecom in Westland
- BSC expansion & DDF termination ZTE equipment .FLASHCOM.
- Measure VSWR
- Laying and terminating Copper and fibre cables
- Ensure mixing of salt, charcoal and soil is mixed
February 2015 to 2018.
Mogadishu stars. Somalia.
Fiber splicing, termination, PA systems and structured cabling.
United Nations office of Somalia. -Currying out site survey. -Supervising of our local staff
-Running of the fiber. -Splicing, termination and testing. -Trouble shooting using OTDR. -Manhole rodding and path clearance. -Public Address installation. -Tranking -Running of UTP cables. -Terminating of the patch panel and modules’. -Path trenching -Testing of the ports using fluke tester and filing of the results. -Site commissioning.
Projects completed and on going Pa installation at mhq, fhq and unsos compounds. Trenching of paths and laying of pipes. - Running of cables. Installation of TOA horn Speakers, Indoor speakers and Amplifiers. Testing of the system. FIBER INSTALLATIONS AT CITS, MOVCON, MLB, FHQ, MHQ AND UNSOS -Running of SM/MM fibers. -Termination of pigtail connectors. -Fiber splicing and managing inside enclose. -Testing and troubleshooting using OTDR. -Arranging inside the ODF. UTP STRUCTURED CABLING AT UN POLICE BOSS OFFICE, AU COFFERENCE HALL,NEW SUPERMARKET AND SURROUNDING PREFABS.
-Site survey. -Creating of new manholes. -Trunking and conduiting. -Running of UTP cables. -Ratch panel and modules termination. -Fixing of face plates and Patrice boxes. -Testing and Commissioning