Coordinating and supervising piping prefabrication and erection activities, carried out by contractors.
Supervising and inspection of level quality performance of construction contractors during piping prefabrication and erection activities.
Ensured Installations conform to Project Codes and Standards
Arranged and coordinated Piping Hydraulic tests according to Project Specification
Arranged and coordinated final punch list activities
Ensured Installations conform to Project Codes and Standards
Raised Technical Queries where necessary
Progress reporting
Attend Progress meetings
Liaise with Site Management on issue Mechanical Completion Certificate
Responsible for Finalizing Piping Handover Certification
Coordination with Inspection Agency after completion of work
Study of drawings and WPS
Checking of Production & inspection activities on shop floor, Onboard like Marking Fit up, Cutting, Edge Preparations, Bevel checking
New ship building pipe routings with checking of elevation plan and arrangement drawings and fallowing of isometric drawings
Inspecting and checking welding according the WPS, monitoring of weldingparameters like Preheating, inter pass and post heating
Inspection of weld
Coordination with Inspection Agency after completion of work
Test package pipe fabrication inspection
Pressure testing for erection pipe systems
Pigging process for crude oil line before and crude oil running time
purging of pipelines with nitrogen gas
Pipeline commissioning of crude oil lines and gas pipeline
Execution, Inspection, Supervision, & Co-ordination of Above-ground and Under-ground piping especially for Refineries
Preparation of Monthly and Weekly progress reports.
Preparation of Job Close out report to maintain the historical data which can be used as feedback mechanism for planning of similar project In future.
To co-ordinate with client, consultant, sub-contractor, design and engineering department regarding the technical problems.
Worked in Utility piping installation and well known with different types of pipes, fittings and valves used utility system. Having knowledge of different types of pumps and pipes used in utility piping
Additionally:
Co-ordination with the Client for ITR’s submission after sub system is completed.
Supervision of the various mechanical maintenance activities in the plant
Knowledge of leak test
Complete and verify PCMS Data Base for the construction, Pre-Commissioning & commissioning and Start up Phases of the project
Responsible for planning on various resource allocations involving manpower, project materials