Resume Solar PV plant Installation in India Nagpur

Solar PV plant Installation
Handymen - Working specialties
1800 $
India (Nagpur)
21-03-2026
Contact person: Madhav Pawar
Age: 41
Phone number: show
Biometric passport
Experience:
8 years
Education:
MBA
Skills:
PROJECT HIGHLIGHT SHEET MADHAV CHHATRAPATI PAWAR Solar PV Project Expert | 52MW+ Total Execution Portfolio STRATEGIC PROJECT OVERVIEW 1. 22.8 MW DC / 19 MW AC Utility Solar Project Client/Company: Everrenew Energy / Avaada (Sangli, India) Timeline: Sept 2024 – April 2025 Role: Execution & Coordination Technical Scope: Oversight of high-ratio DC loading (22.8 MW) to optimize AC output (19 MW). Execution Excellence: Managed the installation of module mounting structures (MMS), DC cabling, and central inverter synchronization. Analytical Impact: Resolved complex site-specific shading and terrain challenges using data-driven problem-solving, ensuring the project stayed on track for grid synchronization. Team Management: Directed multi-disciplinary teams and sub-contractors to maintain stringent quality standards required by Avaada. 2. 12 MW Solar Photovoltaic Power Generation Timeline: Sept 2024 – Jan 2025 Role: Project Coordination Key Achievement: Delivered a 12MW utility-grade plant within a compressed 5-month timeline. Operational Control: Managed the full project lifecycle from site mobilization to final commissioning. Quality Assurance: Implemented rigorous QA/QC protocols for PV module handling and string monitoring unit (SMU) installations to minimize power loss. 3. 6 MW Solar Plant Installation (MEIL) Client: Megha Engineering & Infrastructures (Nanded, India) Timeline: Feb 2025 – July 2025 Role: Project Installation Efficiency Milestone: Increased installation speed by 25% through process optimization and bottleneck analysis. Safety Leadership: Authored and implemented a comprehensive Safety Protocol Manual that was subsequently adopted company-wide. Resource Management: Successfully led the installation of 4MW and 6MW systems simultaneously using optimized labor allocation. TECHNICAL CORE COMPETENCIES System Design & Optimization: Expert in AC/DC system architecture and power generation assessment. Regulatory Compliance: Thorough understanding of electrical safety standards and grid code requirements. Commissioning: End-to-end experience in "Concept to Commissioning" (C2C) workflows. Global Exposure: Professional insights gathered from visits to energy hubs in Russia, Finland, and the UAE, applying international best practices to local project sites. BY THE NUMBERS 52 MW+ Total Solar Experience. 25% Improvement in installation efficiency. 0 Major Safety Incidents under direct supervision. 100% Deadline compliance on multi-megawatt utility projects.
Language skills:
-
Additionally:
PROJECT HIGHLIGHT SHEET MADHAV CHHATRAPATI PAWAR Solar PV Project Expert | 52MW+ Total Execution Portfolio STRATEGIC PROJECT OVERVIEW 1. 22.8 MW DC / 19 MW AC Utility Solar Project Client/Company: Everrenew Energy / Avaada (Sangli, India) Timeline: Sept 2024 – April 2025 Role: Execution & Coordination Technical Scope: Oversight of high-ratio DC loading (22.8 MW) to optimize AC output (19 MW). Execution Excellence: Managed the installation of module mounting structures (MMS), DC cabling, and central inverter synchronization. Analytical Impact: Resolved complex site-specific shading and terrain challenges using data-driven problem-solving, ensuring the project stayed on track for grid synchronization. Team Management: Directed multi-disciplinary teams and sub-contractors to maintain stringent quality standards required by Avaada. 2. 12 MW Solar Photovoltaic Power Generation Timeline: Sept 2024 – Jan 2025 Role: Project Coordination Key Achievement: Delivered a 12MW utility-grade plant within a compressed 5-month timeline. Operational Control: Managed the full project lifecycle from site mobilization to final commissioning. Quality Assurance: Implemented rigorous QA/QC protocols for PV module handling and string monitoring unit (SMU) installations to minimize power loss. 3. 6 MW Solar Plant Installation (MEIL) Client: Megha Engineering & Infrastructures (Nanded, India) Timeline: Feb 2025 – July 2025 Role: Project Installation Efficiency Milestone: Increased installation speed by 25% through process optimization and bottleneck analysis. Safety Leadership: Authored and implemented a comprehensive Safety Protocol Manual that was subsequently adopted company-wide. Resource Management: Successfully led the installation of 4MW and 6MW systems simultaneously using optimized labor allocation. TECHNICAL CORE COMPETENCIES System Design & Optimization: Expert in AC/DC system architecture and power generation assessment. Regulatory Compliance: Thorough understanding of electrical safety standards and grid code requirements. Commissioning: End-to-end experience in "Concept to Commissioning" (C2C) workflows. Global Exposure: Professional insights gathered from visits to energy hubs in Russia, Finland, and the UAE, applying international best practices to local project sites. BY THE NUMBERS 52 MW+ Total Solar Experience. 25% Improvement in installation efficiency. 0 Major Safety Incidents under direct supervision. 100% Deadline compliance on multi-megawatt utility projects.
Chat

Login or register to leave comments.

Recently added resumes.
I need job

MANOJ Kumar

1250 $

India

8 minutes ago

S
Caregiver

Sithabile Maposa Maposa

1000 €

South Africa

21 minutes ago

Head barista

Afham Ansari

1500 $

Lithuania

an hour ago

Similar resumes.
I need job

MANOJ Kumar

1250 $

India

8 minutes ago

S
Caregiver

Sithabile Maposa Maposa

1000 €

South Africa

21 minutes ago

Head barista

Afham Ansari

1500 $

Lithuania

an hour ago

Don't miss out on vacancies abroad

Subscribe to our telegram channel @layboard_in

Don't miss out on vacancies abroad

Subscribe to our telegram channel @layboard_in