Experience:
L’Oreal Company- Egypt
Processing Manager
Jul 2021 – Present
● Responsible for managing all pre-weigh & processing activities of the UP ensuring compliance with all L’Oréal Safety, Quality and Environmental standards.
● Led the factory to improve the MUR (manufacturing uptime ratio) from 100% to 107% and the PUR (processing uptime ratio) from 65% to 71%.
● Led the factory to improve the RFT from 96% to 98.8%
● Responsible for the quality and effectiveness of the process implementation for the sustainability of these processes. Responsible for the execution of the planning (production and maintenance).
● Coordinate new launches with the process expertise and other UP management.
L’Oreal Company- Egypt Sep 2016 – Jul 2021
Performance Engineer
● Manage the EOS (Excellence Operations System) methodology.
● Create and manage the factory driving system through factory KPIs.
● Ensure the support function of Performance department to all other factory departments.
● Lead and coach the factory’s RCAs, good practices, IOs, and PDCA, in addition to the
application of EOS system on floor.
● Managed the improvement opportunities system with 91% completion of tasks.
Al Ahram Beverages Company-Heineken Egypt Dec 2015 – Sep 2016
Packaging Engineer
● Organize and follow the production plan, and insure that all quality parameters are met.
● Ensure a safe working area, and manage losses and consumption.
● Work with the TPM methodologies, lead and participate actively in AM team, and apply
5s
● Assure hygiene and microbiological conditions, and HACCP standards
● Calculate & report the line performance (OPI)
Egyptrol Company- Egypt Apr 2015 – Nov 2015
Commissioning Engineer (Fixed term)
First Gas Company- Egypt Oct 2013 – Apr 2015
Production Engineer
● Managing and developing the operation of manufacturing workshops covering all products and quality.
Education:
Ain Shams university: Faculty of Engineering Bachelor's degree
Major: Mechanical Engineering-Production and Design
Graduation Date: June 2013
Graduation Project : Design of two-sided, time and space optimal assembly line balancing for medium / low voltage electrical panels at ABB-Egypt.
● Design workshop and workstations
● Assembly line Balancing
● Simulation – Person on Charge
● Project Management
Graduation Project grade: Excellent
High school : College De La Salle (2004-2005)
Skills:
LOTO (Lock Out Tag Out)
● ORR (Operational Risk Reduction)
● Sahara Project (Maintenance Program)
● Ariso (Accidents reporting system)
● 5s (Sorting, Set in order, Shine,
Standardize, Sustain)
● BBS (Behavior Based Safety)
● UPS (Unified Problem Solving)
● PR Creation on SAP
● Reporting of accidents
● Presentation & Communication skills
● The code of business conduct
● Life saving rules
● Creative Problem Solving
● 3M PPE
● Ithink Security
● MESUR (Manage, Effective, Safety,
Using, Recognition and Realignment)
● Contract Giver
● SMED (Single Minute Exchange of
Die)
● MDP Program (Management
development program)
Additionally:
Languages
Arabic: Native language
English: Excellent speaking and writing French: Excellent speaking and writing