Experience:
I have 5 years civil Engineering field experience in Sri Lanka. (Sun power construction Pvt./Shino Hydro co-portion/Siara Civil construction Pvt./Kngnam pvt.Lit)
From2005 to 2010 :
Sunpower construction
pipe laying (200mm - 1200mm DI pipe), yard piping work,1600m3 ground water sump & pump house construction
Sierra construction
Two floors building construction with all structural and finishing work.
Shinohydro Co-peration
Highway construction (20 km)
❖ I have over 10 years INFRA, MSE Wall System & Structure field experience in Qatar as site Engineer. From 2010 Feb 04 to up to 30/05/2020 in Chairman Trading & Contracting Est.
● Steel works, F/W and other all structural work in two Majid in garafa and madinakalifa(their is three floors+ underground basement).
● Block work, Plaster work in many projects,
● Excavation work. Pipe laying around 5km in qatar foundation golf cost. (Lake overflow conection ) ,basements and foundations excavation in many projects.
● Interlock & kerb Stone lying
Qatar foundation golf cost, al rayan football ground, Barwa city, doha- alkhor high way shoulders.
● Chamber and Manhole R/F Work, F/w & Concrete work.
Qtel M.H
Drainage water MH
Shokaway MH
Underground cable duct.
● rode work in Qatar.
Concrete plant internal road construction work. In lusail and duhail.
● Serving &levelling work.
I have experience to use level instruments and TL instruments.
● instructed and planing Shuttering Fabrication.
For the above all project.
● Site planning.
Fallow all the approved site drowning and brief to site Formens and workers.
Revising and submitting drowing.
● Complete site documentation work.
RFI, permit for al site execution at site(work permits, hot work permit ), progress report, all execution plans.
● I have good knowledge and experience for prepare Reinforcements bending scheduling.
● I have good experience for face project meetings.
● I have good experience about MSE Retaining Wall system Construction.
In Benihajar intersection work with QBC, In us base and Alkhor Football stadium
❖ I have one year House conection experience for sewerage water line with Metito overseas qatar from 1/6/2020 to 30/5/2021.
Sewerage system house conection work with Ashgal. Including pipe laying MH construction, excavation work, road reinstatement work. (Asphalt work)
❖ Responsible for establishing a safety focused culture.
❖ To maintain cost and look for cost saving ways to execute the work
❖ Manage manpower to meet scheduling and keep a good productive factor in the department
❖ Strategic thinking and leadership with strong abilities in relationship management
❖ Direct the day-to-day field operations through Foremen and Subcontractors, providing necessary technical guidance and leadership
❖ Ensure Company tracking methods and systems are implemented to measure productivity levels, coordinate with fleet and tool management, and perform regular review of job cost and progress reports
Skills:
● English speaking and writing well.
● Operate Auto-CAD well.
● Hindi speaking well.
● Operate level instrument well.
● Knowledge in MS Project.
● Knowledge in MS-Office Package.
Additionally:
● Steel works, F/W and other all structural work in high raise building.
● Block work, Plaster work
● Excavation work.
● Interlock lying
● Setting out works
● Chamber and Manhole R/F Work, F/w & Concrete work.
● All Concrete Work.
● All rode work.
● Serving &levelling work.
● Shuttering design work.
● Site planning.
● Complete site documentation work.
● I have good knowledge and experience for prepare Reinforcements bending scheduling.
● I have good experience about quotation & Quantity Surveying.
● I have good experience for face project meetings.
● I have good experience about MSE Wall system.