Experience:
MARCH 2022 - PRESENT, SAUDI ARABIA
CONSTRUCTION SUPERINTENDENT, BR. C.A.T. INTERNATIONAL LTD.
Team Leader in Shutdown and construction of Wellheads, Plant Piping Systems in multi-discipline works - Civil/Structural/Mechanical/Piping, and Pipelines (Trunkline & Flowlines). Works include generation of work procedures/methodologies (installation & pre-commissioning), planning of site activities, resources distribution, ensuring appropriate work permits acquired, supervision-ensuring safe working environment and quality of works, monitoring, logistic works, progress reporting, and focal point on technical aspects.
.
JULY 2015 – MARCH 2022, SAUDI ARABIA
PROJECT ENGINEER/SUPERINTENDENT-MULTIDISCIPLINE, SAUDI ARAMO (SMP)
Responsibilities include not limited in overseeing and managing site construction to achieve project objective within allocations, project specifications, and safety requirements. Involved in Front End Engineering & Design, Construction, Testing, and commissioning. Focal point and leads in resolving site/construction technical issues. Work also involves actual site supervision, responses Site TQs, and reviews and approves Construction Methodologies & Job Safety Analysis, , progress monitoring & reporting, and other project engineering & management works.
AUGUST 2012 – JUNE 2014, PAPUA NEW GUINEA
PIPING ENGINEER/INSPECTOR, CHICAGO BRIDGE & IRON (CB&I) CO.
Responsible in the establishment and general implementation of the quality and proficiency of General Piping (UG/AG) during the installation and complete testing and commissioning (includes Test package preparation, review and close-out) to handover of general area - processing plant, 8 Wellheads, tanks, and utilities for the 1B scf per day capacity gas (LNG) conditioning plant.
MARCH 2007 – JUNE 2012, SINGAPORE/THAILAND/MALAYSIA/INDONESIA
SENIOR FIELD ENGINEER (ONSHORE/OFFSHORE), NIPPON STEEL ENGINEERING CO. LTD.
Responsible in the establishment of work procedures and field engineering (implementation) of the fabrication, loadouts, complete installation (onboard), testing & commissioning of subsea pipelines & components and offshore platforms. Job also includes inspection and load testing of equipment/appliances and rigging gears.
MAY 2005 – MARCH 2007, RUSSIA
PIPING ENGINEER/INSPECTOR, CHICAGO BRIDGE & IRON (CB&I) COMPANY
Responsible in the quality inspection works – multi discipline in the construction and complete testing of superstructure (2 x 100,000 cubic meter full-containment LNG storage) and 2 x 1,630 cubic meter LNG Hortonsphere pressure vessels and associated piping works.
JUNE 2003 – APRIL 2005, NIGERIA
PIPING ENGINEER/INSPECTOR, CHICAGO BRIDGE & IRON (CB&I) COMPANY
Responsible in the implementation of the quality and proficiency for the piping fabrication, installation, and testing/pre-commissioning of General Piping (UG/AG) systems and pipelines (in-plant, off-sites, and jetty – at loading arms) for the 4.1 mtpa LNG production train-4 project.
FEBRUARY 2002 – JUNE 2003, PHILIPPINES
PROJECT ENGINEER, MODAIR MANILA COMPANY LIMITED, INCORPORATED
Responsible in the project engineering (documentation and implementation) of General Electro-mechanical Systems for the construction of Industrial Plant, and communication projects; MEPF Works.
MAY 1999 – FEBRUARY 2002, PHILIPPINES
PROJECT ENGINEER, SUMISETSU (SUMITOMO DENSETSU) PHILIPPINES, INC.
Responsible in the project engineering (documentation and implementation) of General Mechanical Systems for the construction of Industrial Plant and High-Rise Condominium, and airport projects (low & high-rise); MEPF Works.
APRIL 1998 – MAY 1999, PHILIPPINES
PROJECT ENGINEER, ALPA PLUMBING WORKS, INCORPORATED
Responsible in the project engineering of General Plumbing/Drainage works in the construction of high-rise office building project.
JULY 1997 – APRIL 1998, PHILIPPINES
ASST. PROJECT ENGINEER, PHILSAFETY SYSTEM EQUIPMENT, INCORPORATED
Responsible in the project engineering of Fire Protection project in the construction of high-rise Condotel building project.
Education:
ACADEMIC/FORMAL:
MACH 1997, PHILIPPINES
B.S. MECHANICAL ENGINEERING, ANDRES BONIFACIO COLLEGE, PHILIPPINES
Completed on time (exact 5 years per requirements). Passed the Licensure Board Examinations for Mechanical Engineers and Master Plumbers given by Professional Regulation Commission (PRC).
DECEMBER 2022 (POST-GRADUATE DEGREE)
MASTER IN BUSINESS ADMINISTRATION (MBA), AB COLLEGE, PHILIPPINES
Thesis Completed ; Candidate for Graduation (GPA: 1.25)
**************************************************************************
INTERNATIONAL CERTIFICATIONS:
AUGUST 2020, U.S.A (PROJECT MANAGEMENT CERTIFICATION COURSE)
PROJECT MANAGEMENT PROFESSIONAL (PMP), TECHNOLOGICAL INSTITUTE OF AMERICA (TIA)
Completed and passed the Certification Examination given by Project Management Institute (PMI).
DECEMBER 2020, U.A.E. (OCCUPATIONAL HEALTH & SAFETY PROFESSIONAL CERTIFICATION COURSE)
OCCUPATIONAL HEALTH & SAFETY MNGT. (NEBOSH IGC), HSEPRO,DUBAI
Completed and passed the IG1 Unit Examination given by NEBOSH; waiting for IG2 Unit Exam Result.
***************************************************************************
TECHNICAL COURSES:
MARCH 2022, PHILIPPINES (WELDING TECHNOLOGY/PROFESSIONAL COURSE)
WELDING INSPECTOR COURSE, HEATS SCHOOL OF WELDING TECHNOLOGY INC.
Completed
AUGUST 2014, PHILIPPINES (202HRS. SKILL DEVELOPMENT TRAINING)
PIPEFITTING NC II, TECHNICAL SKILLS DEVELOPMENT AUTHORITY (TESDA).
Completed
Skills:
REGISTERED MECHANICAL ENGINEER
General Mechanical Engineering
License No. 0103632
Professional Regulation Commission (PRC)
Manila, Philippines
PROJECT MANAGEMENT PROFESSIONAL (PMP-PMI)
Project Management
Project Management Institute (PMI)
Certificate No. 2811858
PMI, U.S.A
REGISTERED MASTER PLUMBER
General Plumbing System
License No. 0013575
Professional Regulation Commission (PRC)
Manila, Philippines
NEBOSH INTERNATIONAL GENERAL CERTIFICATE
Occupational General Certificate
(Passed the IG1)
Additionally:
SUMMARY OF CONSTRUCTION PROJECTS EXPERIENCED:
• O&G Refineries
• Gas Conditioning Plant
• Gas & Oil Separation Plant
• Pipeline & Piping (onshore & offshore) fabrication, coating, Tie-in (cold & hot topping – onshore & subsea), loadout, and laying/installation
• Offshore Platforms fabrication, loadout, and installation
• Offshore Hook up works (Multidiscipline)
• Erection Works – piping, platform & jacket installation (heavy lifting), and structural assemblies
• Insulation & Heat Tracing Works
• Industrial processing plants
• Bulk Plant & Distribution Hub/Terminal (Electro-mechanical, Tanks, piping, pipelines, buildings)
• Large Volume Tanks construction (various types)
• Gas (LNG) conditioning plant
• Water Treatment Plant
• Wellheads (onshore/offshore)
• Pump Stations
• Abandonment & Recovery works-pipeline
• Plant shutdown & upgrading
• Decommissioning works – Platform/Pipeline
• Hi-rise buildings (MEPF)
• Industrial & commercial buildings (MEPF)
• Clean Rooms (MEPF)
• Mall (MEPF)
• Cell Sites Relay Stations (Multidiscipline)
• Airport (MEPF)
• Site Civil Works
• Structural fabrication and installation