Experience:
WORKING EXPERIENCES & JOB RESPONSIBILITIES
• Sept. 28, 2019 – Dec 18, 2021, Engineering Consultants Group, Senior Mechanical Engineer
Review project contract documents; design review, site supervision, review material and shop drawing submittals, as-built drawings, operation & maintenance manuals; ensure all works comply with project specifications, documents and international & local codes; Witness start-up activities and Testing & Commissioning and Air Balancing of HVAC System; Plumbing/Sanitary Works; Fire Protection System; FM 200 Fire Suppression System; Water Treatment System, Deionization System; Dental Gas System; Infrastructure Water Network, Fire, Storm & Drainage Network System and Irrigation System ; Assist Quantity Surveyor in reviewing Mechanical Works contractors valuation payments;
1. ASHGHAL Project - Construction of Health Center at Al Khor and Ain Khaled Doha, Qatar.
(Project Supervision Sr. Mechanical Eng’r.). A prototype C Health Center Project consisting Ground and First Floor. The clinic comprises of Men’s and Women Clinic, Dental Clinic, Consultation Rooms, Walk-in clinic, Radiology, Pharmacy, Laboratory, Storages, Admin, Chronic Disease Clinic, Pre-Marital services, Staff Facilities, Internal Open Courtyards, Swimming Pool (Al Khor), Public & Staff Parking, Ancillary Building, Mosque, Service Bldg., Guard House Watchman Rooms, Waste Holding, Ambulance Garage with all associated MEP and external infrastructure works.
• Oct. 12, 2012 – June 30, 2018, Engineering Consultants Group, Senior Mechanical Engineer
Responsibilities includes review project contract documents; design review, site supervision, review material and shop drawing submittals, as-built drawings, operation & maintenance manuals; ensure all works comply to project specifications, documents and governing international and local codes & standards; Witness start-up activities and Testing & Commissioning and Air Balancing of HVAC System; Plumbing/Sanitary Works; Fire Protection System; FM 200 Fire Suppression System; Sewage Treatment Plant; RO Plant; Gray Water System & Treatment Plant; Water, Sewage & Irrigation Pumping Stations; Infrastructure Water, Storm & Drainage Network System and BMS System ; Assist Quantity Surveyor in reviewing Mechanical Works contractors valuation payments;.
Major Projects handled:
1 PEO Project - Banana Island Resort Doha by Anantara – Doha, Qatar.
(Project Supervision Sr. Mechanical Eng’r.). An island resort with 141 rooms, suites, pool villas, over water villas, R.O. Plant, HVAC (Chiller, VRV & Split) System, Fire Fighting System, FM200 Fire Suppression System, 5.0T EOT Crane, Plumbing Works, Swimming Pools, Lagoons, Water Features, Irrigation System, Fuel System and Sewage System & Treatment Plant.
2 ASHGHAL Project - Construction of Health Center at Al Shamal Doha, Qatar.
(Project Supervision Sr. Mechanical Eng’r.). The project comprises of Administration Offices, PWCIS (Primary Centre Walk-In Service), Walk-In Clinics, Imaging, Laboratory and a Pharmacy on ground and first floors. External Buildings comprises of Ancillary building, Mosque, Watchman Rooms, Guard House, Waste Holding, Service Building and Ambulance garage with all associated MEP and eternal infrastructure works..
3 PEO Project - Amiri Diwan Annex Building – Doha, Qatar.
(Project Supervision Sr. Mechanical Eng’r.). The project is a very unique that requires sensitivity and care. The building is efficiently house the administrative services and offices including Qatar’s National Archives.
4 ASHGHAL Project - Construction of Seven (7) New School Project – Doha, Qatar
(Project Supervision Sr. Mechanical Eng’r.). A mixed use development project forming the educational element of Qatar.
5 North Gate Mall – Doha, Qatar
Project Supervision Site Support Engineer for the construction of North Gate Mall.
6 PEO Project - Al Ashmak Heritage Project – Doha, Qatar
Project Supervision Site Support Engineer for the construction of Al Ashmak Heritage Project
7 Lekhwiya Sports Stadium – Doha, Qatar
Project Supervision Site Support Engineer for the preparation of Civil Defense inspection. The project is a Sports Complex consisting of Football Stadium, 4-Training Fields, Multi-purpose Hall, Fitness Center and Hotel. It also includes tall necessary Infrastructure works such as Utility Building, Services Tunnel, 2-Changing Rooms, Mosque, 6-SubStations and Sewage Treatment Plant.
8 PEO Project - Heritage Hotel Project – Doha, Qatar
Project Supervision Site Support Engineer for the construction of Heritage Hotel Project. Discretely nestled along the Al Wakra beachline. An iconic and historical houses were meticulously rehabilitated.
9 JW Marriott Hotel Tower (3B+G+M+51) – Doha, Qatar
Project Supervision Site Support Engineer for the construction of JW Marriott Hotel Tower. One luxury hotel consisting of 3B+G+M+51 floors with a height of 215.4 meters.
• July 8, 2006 – Aug. 23, 2012, ARCO Electro-Mechanical (Al Ryum Group)– Sr. Mech’l Eng’r
Execute building, Industrial & infrastructure works and all water related projects (DEWA Pumping Stations, Dubai Municipality Water Features system, HVAC System, Fire Protection System, Plumbing Works, Irrigation & Sewage System and DEWA & FEWA Transmission Piping Lines. Preparation of construction drawings, material submittals, shop drawings, as-built drawings and Operation & Maintenance Manuals; Responsible for the Engineering, procurement and construction installation;
Major Projects handled:
1. DEWA/CW/371/2007 – Supply, Install, Test and Commission the Pump Motor Units & Associated Switchgear in Najma Pumping Station Phase 1– Dubai, UAE.
2. DEWA/CW/630/2007 – Construction of Two Pumping Stations each with 60 MIGD Capacity in Location No. 5 and Location 7 Complete with Surge Protection System and Associated Electro Mechanical Works – Dubai, UAE.
3. DEWA/CW/0146A/2010 – Design, Supply, Installation, Testing & Commissioning of Chlorine Dioxide Dosing System @ Mushriff Reservoirs Phase 1 to 6 including all Chlorination Lines, Interconnection with Existing Chlorination Lines, All Associated Earth Works, Civil, Electrical & Drainage Works, Automation System, Safety Equipment – Dubai, UAE.
4. DEWA/CW/O771/2009 – Replacement of Valves and Header Pipes with Associated Fittings for Najma Pumping Station Phase-I & Phase-II – Dubai, UAE.
5. FEWA/6W2010 4 MIG and 2x1 MIG R.C.C Water Tanks in Central Area – Fujairah, UAE.
6. FEWA/15W2010 3x2 MIG R.C.C. Water Tank in Ras Al Khaimah Area – Ras Al Khaimah, UAE.
7. Burj Dubai Development Project:
• Business Park Phase I – Water Features, Irrigation & Landscaping Project
• The Residences Phase II - Landscaping and Irrigation Project
• The Old Town Residences – Landscaping & Irrigation Project
8. Dubai Municipality Project (Landscaping & Irrigation System Project)
• Mirdiff Park
• Al Quoz Pond Park
• Al Nahda Pond Park
9. Jumeirah Village II Infrastructure Project
• Irrigation Pumping Station
• Sewage Pumping Station
• Oct. 22, 2001 – Aug. 31, 2005, DMJM International (Maunsell-Aecom Philippines)– Mechanical Engineer
Detailed at Davao Airport Consultant (DAC) and assigned as Mechanical Engineer Consultant/Inspector at Davao International Airport Development Project. Oversee Mechanical Works activities and ensure that all Electro-Mechanical installations meets with the requirements of the Technical Specifications and Contract Documents. Inspect materials on site, checking of test certificates, factory test reports, certificate of origin etc. and ensure that all works complies with applicable international and local standards. Review and approved all Mechanical Works As-Built Drawings and O&M Manuals submittal. Witness Testing and Commissioning of all Mechanical Works. Review and approved As-Built Drawings and O & M Manuals. Involve in project close-out exercises such as Bill of Quantity Re-measurement and handing over of project completion documents.
Had been involved in the Supervision and execution of Davao International Airport Project HVAC, Plumbing Works and Fire Protection System:
1. Passenger Terminal Building
2. Air Traffic Control (ATC) Building
3. Central Plant Building
4. Maintenance Building
5. Cargo Terminal Building
6. Fire Crash & Rescue Building
7. Infrastructure Works (Chilled Water Piping System, Storm & Sewerage System, Potable Water System, Fire Water System and Water Filtration System).
• Jan 22, 2000 – Sept. 15, 2001, Dynamic Planner and Construction Corp., Phils. – Sr. Mech’l Eng’r
Review all Mechanical Works Contract Documents, Specifications and General Provisions of (HVAC System, Fire Protection System, FM200 Fire Suppression System, Sanitary/Plumbing Works and Storm & Sewage System). Prepare detailed shop drawings, materials submittals, quantity take off. Execute and supervise all Mechanical infrastructure and building works. Attend construction progress and technical meetings with client representative, consultants and specialist contractors and all other discipline Engineers. Implement safety programs and good housekeeping.
Had been involved in the execution of Davao International Airport Project HVAC, Plumbing Works and Fire Protection System:
1. Passenger Terminal Building
2. Air Traffic Control (ATC) Building
3. Central Plant Building
4. Maintenance Building
5. Cargo Terminal Building
6. Fire Crash & Rescue Building
7. Infrastructure Works (Chilled Water Piping System, Storm & Sewerage System, Potable Water System, Fire Water System and Water Filtration System).
• Sept. 1997 – Jan. 1999, Jits Construction Corp., Phils. - Project Eng’r.
Designated as Mechanical Project Engineer, Review Mechanical construction documents (Plans, Specifications & Submittals). Ensure that all construction, materials and installation works are implemented in compliance with all the plans, specifications and other related contract documents. Prepare shop drawings, material submittals, material quantity take off and manpower scheduling. Prepare Mechanical Works progress payments and maintain records at jobsite, shop drawings, materials and equipment deliveries and submittals. Implement safety and good housekeeping.
Major Projects handled:
1. Installation of Fire Hydrant System at APO Cement Corporation in Naga, Cebu, Philippines.
2. Installation of 2-Megawatts Diesel Power Plant at National Power Corporation in Mamburao, Occidental Mindoro, Philippines.
• June 1995 – July 1997, Al-Yahya Corp. – Riyadh, KSA, Plumbing Eng’r.
Responsible for the rehabilitation, Design, Operation and Maintenance of all Water and Sanitary Works in Royal Saudi Air Force and King Faisal Air Academy. Rehabilitate and implement proposed design of water and drainage piping layouts and replaced old and dilapidated transfer, booster pumps and lifting stations submersible pumps. Develop and implement solutions to all operational problems involving Water/Sanitary works. Monitor and supervise manpower distribution, equipment resources, spare parts and work progress.
Had been involved in the Rehabilitation, Design, Operation and Maintenance of Water and Drainage Works in:
1. Royal Saudi Air Force in Riyadh, Kingdom of Saudi Arabia
2. King Faisal Air Academy in Riyadh, Kingdom of Saudi Arabia
• Jan. 1995 – June 1995, Richville Builders & Management Corp., Phils., Mechanical Project Engineer
Act as one of the management team engineers, provide technical assistance in the preparation of project design, specifications, bill of quantity and costing. During construction stage, perform construction supervision to the contractors and ensure that all construction works are executed in accordance with the technical specifications and contract documents. Evaluate Mechanical works progress billing by the contractors. Implement construction safety programs and good housekeeping.
Major Projects handled:
1. 1B+18F First corporate Plaza at Madrigal Business Park, Ayala Alabang,
Muntinlupa, Manila Philippines.
2. Honeyboy Palanca Residence in Ayala Alabang, Muntinlupa, Manila,
Philippines.
3. 9 High End Residential Houses in Ayala Alabang, Muntinlupa, Manila, Philippines.
• Mar. 26, 1994 – Jan. 12, 1995, O.V. Roy Construction Inc., Phils., - Mechanical Engineer Assistant
Responsible for the scheduling of construction works, project implementation and construction manpower supervision. Prepare quantity/material take-off and canvassing of the proposed materials and equipment listed on the vendors list. Revise and refine estimates as construction proceeds and as required to incorporate approved changes as they occur. Prepare shop drawings and material submittals. Attend construction coordination and technical meetings with consultants and clients.
Major Projects handled:
1. 2B+9F Philippine Long Distance Telephone Co. Tower Office & Communication Center with 2 Common Basement Parking Levels – HVAC System, Plumbing/Sanitary Works And Automatic Fire Protection System.
• Sept. 20, 1993 – Jan. 15, 1994, Jits Construction Corp., Mechanical Engineer HVAC
Responsible for the rehabilitation of a 3-star hotel HVAC System. Review Plans, Specifications and Contract Documents. Supervise the installation of Ductworks, Chilled Water Pumps & chilled water piping works including pipe insulation, Air Handling Units, Fan Coil Units, exhaust fans, fresh air fans, blowers, motor actuated valves, thermostat and all other HVAC devices and appurtenances. Prepare material quantity take off, shop drawings and material submittals. Attend technical meetings with the project management team and consultants. Implement safety programs and good housekeeping.
Major Projects handled:
1. Davao Insular Hotel Renovation Project in Davao City, Philippines
• April 7, 1992 – July 16, 1993, Davao Light & Power Co. Inc., Phils- Mechanical Engine Tender
Responsible for the operation and monitoring of Diesel Power Plant diesel engines. Record oil engine pressures and temperatures in an hourly basis including engines water cooling system and fuel system. Ensure that all engine operating parameters are within its limits. Coordinate with the Shift Supervisor or Plant Manager any abnormalities found during the operation.
Skills:
Twenty-Five (25) years of multi-faceted experience with profound knowledge in Mechanical Works from design review, shop drawings, material submittal review, construction supervision and implementation. Works well in a team with cultural sensitivity and an ability to build rapport in multicultural settings, able to work under pressure and multi-tasking:
• Excellent training and organizational development skills.
• Construction, Management & Supervision - from tender stage of the project to engineering, planning, submittals, construction, testing & commissioning and Final Handing Over.
• Profound knowledge in design review, construction supervision, inspection, testing & commissioning, operation and handing over of Water Pumping Station, Sewage Pumping Station, Irrigation and Landscaping, R.O. Plants, Power Plant, HVAC, Plumbing Works, Fire Protection System, FM200 Fire Suppression System, Swimming Pool, Water Features, Infrastructure Water, Storm & Drainage Networks and BMS System.
• Complete understanding of project documents, construction drawings and specifications, applicable international & local codes & standards.
• Resolving project disputes with minimal management assistance.
• Ability to work independently with minimal supervision and handling multiple projects.
• Oral and written communication.
• Microsoft Software such as Word, Excel & Auto Cad