Additionally:
1) Apply tile to walls, floors, ceilings, and promenade roof decks, following design specifications
2) Examine blueprints, measures marks surfaces to be covered and lays out work
3) Measure & cuts metal lath to size for walls ceilings with tin snips
4) Tack lath to wall ceiling surfaces with staple gun or hammer
5) Spread plaster base over lath with trowel levels plaster to specified thickness, using screed
6) Spread concrete on subfloor with trowel levels it with screed
7) Spread mastic or other adhesive base on roof deck, using serrated spreader to form base for promenade tile
8) Cuts and shapes tile with tile cutters biters
9) Position tile taps it with trowel handle to affix tile to plaster or adhesive base
10) May be designated according to type of work done as Roof-Promenade-Tile Setter construction