Experience:
(18+ Year Experience in construction field following areas Thermal Power Plant 2x250MW, 2x600MW (CHP, AHP), ACL Steel Mill Project Plant, LNG Storage Tank, Residential and Commercial Buildings & 33KV/11 KV 20MVA Primary Substation, Mushroom Compost facility buildings).
Education:
Diploma In Civil Engineering & B.Tech In Civil Engineering
Skills:
7+ Years Experience in Oman
Experience in Construction of Mushroom Compost facility buildings: Construction of Compost Tunnel Building, Bunker building, MSI building, RM Lab, Micro Lab, Soya Gypsum stock yard, Weigh bridge, Compost packing hall, compost Block storage yard, wheat straw stock yard, mechanical work shop, RO plant, Boiler Room, Raw water Pump house, Diesel Tank, Chill water foundation, Raw water tank foundation, STP, Diesel Generator Room, straw pit conveyor, Percolator water tank, 11KV Panel room, 33KV Outdoor Switch Gear room, Unloading ramp, Store room, Worker Accommodation building, Staff Accommodation Building, Family Accommodation, security Guard room, Admin Building, Compound wall, Internal Asphalt road, Manhole, Collection Pit, Drainage arrangement ect.,
Experience in Construction of 33KV/11 KV 20MVA Primary Substation: Construction of33KV /11KV 20MVA Transformer foundation, Fire wall, Station transformer foundation, External cable trench, Capacitor bank, Control building (11KV Switch Gear Room, 33KV switch gear room, CRP room, Battery room) compound wall, Internal road Asphalt, RIP RAP ect.,
Additionally:
11 Years Experience in India Thermal Power Plants Power House: Construction of (TG Foundation, columns, Slab) Turbine Generator Foundations, Power House Building Foundation, CW Duct Foundation. Boiler Area : Boiler area Foundation and Cable trench ect., Ash Handling Project: Ash slurry Pump house, Ash dyke, Ash pipe pedestal, Ash silo, Pipe rack Structure, Pipe Cross over structure, Culvert & road work etc., Coal Handling Project: Underground RCC tunnel conveyor, Underground transfer house, Penthouse, JNT’s ect., Experience in Experience in Oil and Gas Project: Construction of LNG storage Tank Civil activities Piles, Pile buildup, base slab construction, Wall construction, Post Tensioning work Base slab, Ring Beam, Walls and Tank Roof construction work ect.,
Experience in ACL Steel Mill Project Plant: Construction of equipment Foundations Entry pulpit, Coated pulpit,Clean and Rectification building, etc.,
Experience in Residential and Commercial: High raised Apartment building, IT Park Infosys Buildings, IT Park Progion BPO Buildings, Hotel and Shopping Malls finishing work having good experience.