Experience:
Experienced Electrical Engineer (KNPC/MEW Approved) with around Thirteen years of construction/ project & Maintenance experience in Oil & Gas power & utility of which more than 12 years in Middle East.
Experience in project management, construction supervision, installation, pre-commissioning & commissioning activities, operation and maintenance of HV/MV/LV switchgears, MCCs, Transformers, UPS
Education:
Bachelor of Engineering in Electrical from Finolex Academy of Management & Technology, Ratnagiri (University of Mumbai).
Diploma in Industrial Electronics from Maharashtra State Board of Technical Education,(MSBTE)
Project Management Professional (PMP) From PMI (ID No.3025942)
IOSH Managing Safely, UK
Skills:
Provide support to the operations for equipment testing, troubleshooting, routine equipment surveillance and start-up activities.
Liaise with Mechanical and Electrical sections and establish a seamless integration between operation and maintenance teams to ensure compliance to the planned maintenance activities.
Provide technical support in the field for the execution of critical maintenance activities of the equipment’s to ensure that the problems are resolved with minimum down time
Assess the workload, backlog and the work plan and coordinate with relevant sections.
Monitor and control required material, spares, consumables and tools in high quality and quantities to ensure continuous availability
Conduct and implement root cause analysis of equipment failures and non-scheduled shutdowns and recommend problem resolutions to increase the reliability and availability of equipment
Provide technical support for development, implementation and commissioning of new projects
Participate in defining the technical requirements, technical bid evaluation and inspection of materials on receipt to ensure specifications and required quality.
Monitor the performance of Contractors for the assigned works to ensure quality and standards.
Responsible for the overall management, co-ordination between all concerned parties & departments (client, Operation, Maintenance, Engineering, PMC, EPC Contractors, Subcontractors and Vendors) and follow up of day-to-day development of project related activities
Review interface information’s and documents received fromPMC, Contractors, and Operation Department and ensure that all required information is provided.
Provide input for preparation of the Department/ Section budgets and assist in the implementation of the approved Budget and work plans to deliver Section objectives.
Participate in FAT/SAT, Pre-commissioning& Commissioning activities.
Participate in Pre-Startup Safety Review (PSSR) Walk Downs as a discipline member representing Project Department.
Responsible for resolving any contradiction or difference in the nature or content of comments received from the PMC and different KNPC departments
Installation and erection of 132Kv 33KV,22kv 11KV Switchgear, Control & Relay Panel, Bus bar Protection Panels and 11/0.415kv LVAC System, HVAC System, capacitor bank and
Reactors and 110VDC, 48VDC System, and charging panel.
Installation of Power Transformers of capacity 33/11KV, 20 MVA.
Prepare the Cross Ferruling for Electrical, Control, and Instrumentation Cables as per the Philosophy approved in the project and testing of cables for Insulation Resistance (IR & Continuity)
Installation of cable trays, trucking, GI Rigid conduit &fittings and Supports For the power/Control cable.
Coordination for MEP works of sub-Station, shelters, and building such as HVAC system and Lighting and power system
Review the necessary documents in line with the drawings. Such as the DB Schedules, Load Summary, Cable Sizing Calculations, Etc
Check the execution of works on site as per the Approved Drawings, documents & Project Specifications.
Installation of light fixtures, Distribution & Control Panels, Fire Alarm Systems, Public Address Systems, Door Access Systems, CCTVs, Home Automation Systems
Differential Pressure Transmitters, Temperature Transmitters, Humidity Transmitters, Flow Switches, Actuators for Valves and Motorized Dampers, etc.
Installation and support for Testing and Commissioning of the Impressed Current Cathodic Protection System for the pipeline, Tanks Protection with a CP Engineer of Structure, and Final ON/OFF Potential Measurement after Polarization of the Structure.
Preparation of Technical Submittals to the Client for the Approval of Materials from the VEC List.
Ensure the Material Delivered to the Site is Approved and in line with the Project requirements
Knowledge related to Safety Documents such as Permit to work, Job Safety Analysis, etc. And other documentation required for different activities.
Prepare and maintain all QA/QC records (Inspection requests, materials acceptance & Installation, and QA/QC Auditing
Inspection check sheets, Test records NCRs, etc.) At site as per requirements.
Responsible for everyday planning and handling/Organizing Construction, Inspection, and Testing activities at the site
Inspect the work done in line with the project requirements and offer the Inspection to Client for the Works
Co-ordinate with all related personnel, Vendors, and Client to solve any Technical Issues Which rises at the site
Arranging the manpower and the material at the site in line with the project schedule to ensure
The smooth flow of work without any obstruction, prepare the work Plan and follow it up as per the planned schedule
Arranging Permits for Site Works and Ensuring the limitation of work as mentioned in the permit.
Permit signing and closure of permit as recommended by the safety personnel and the Client
Ensure all the HSE Standards and Procedures of the Client are being followed
Additionally:
Trainings & Additional Courses:
Work Permit Authorization - Executer Trained by KNPC.
Confined Space attainder Authorization Trained by KNPC.
Basic Fire Fighting Course by KNPC.
Basic First Aid /CPR, AKAAZ CAPITAL
Project Planning and Control