Experience:
More than 11 years of experience related to the construction field of electrical.
Education:
BS.Electronics
DAE.Electronics
Skills:
Electrical Engineering
Equipment Installation
Performance Checks
Instrumentation
Documentation & Scheduling
Resource Optimization
Team Management
HSE Activities
Team Leadership
Manpower Management
Material Management
Quality Control
Estimation and Tendering Maintenance Project
Project Management
Additionally:
Installation, loop checking, and function test of ACCU,AHU,CFU,BF,MD,PDT,TT,MT/TT,TH,
MFSD,PDS, FD, etc.
Testing of HVAC Superheat Subcooling system.
Installation, loop check and function test of MCP,MSP,LCP and DSW for power & control system.
Motors installation, its SOLO RUN test without load and with loads.
Pre-commissioning and commissioning of the complete HVAC system.
Preparation of red line drawing for modification of the instrument's location.
Inspection of devices and coordination with clients, vendors, and quality department.
Installation of cables, underground cable laying activity, installation of duct bank and precast duck bank installation, cables test, cable glands and it’s termination, installation of JB’s and terminals box.
Panels phenolic tagging, ferrule, and location marking.
Installation of welding receptacles in outdoor areas.
MCC cable installation testing and inspection.
Installation of devices and its loop checking.
Installation of instruments rack and panel.
Monitoring daily Instruments installation and testing activities and verifying that it complies with the project specification.
Redlining the drawings, Termination schedules, Instrument Loop Diagram (ILD), Datasheets, etc., as per the modifications made on-site.
Worked with DCS and performed loop checking as well as new loop connection troubleshooting from field to field via DCS.
Inspection and testing of loops from field instrument to control room DCS signal working as per database checked the alarms conditions and stroke checked for the MOV control valves.
Installation of combustible gas and Hydrogen Sulfide Air Detection system installation, calibration, and testing.
Testing and installation of Fire Alarms, Beacon lamps, Sounder, LED, Manual Pull Stations, Heat Detectors, Flame able Gas Detectors devices and their JB and panels.
Installation of CAT, MI, Fiber Optics, and communication cables.
Verifying of Motor control system, and switchgear, as per given standards.
Turbine barring vibration test.
Speed test of motors against the different AC frequency levels.
Involved in FAT inspection of LV, and MV cables testing as per the standards of MESC &SAUDI cables.
Testing of UL13, UL-2250, IEC60502-1, IEC60331, UL2250& SES X08-SO1 instruments, power, and communication cables.
Monitoring of instruments' performance, and troubleshooting existing devices to ensure that effective repairs are made.
Sound knowledge in the loop and continuity checks and functional checks.
Confirming that the Calibration of the instruments match with the specifications in the Instrument Data Sheet.
Review Project drawings and apply Contract Codes, Standards and specifications.
Responsible for the inspection of the installation of Instruments, Conduits and fittings (above and below ground), Cable trays/ladder racks punching and trunking type of tray Cables, Junction Boxes, Control Panels, Consoles, wiring termination, impulse tubing as per the project specification.
Electrical/Instrumentation construction program inspection.
Prepare new Hook up drawings for any modifications and take the approval from the client.
Discuss and resolve the problems associated with measurement variables in the datasheets with the process people.
Review of P & ID, Instrument Specification Sheet (ISS), Instrument Data Sheet (IDS), Instrument Installation Sheet (IIS), Wiring Diagram, Tubing Hook up.
Responsible to verify the installation of the instruments by performing inspections as per the Inspection and Test Plan (ITP) and record the findings on the Quality Record (QR).
Carry out the surveillance inspections of wiring termination and checking that all the tags are as per the termination schedule.
Preparing daily documentation of the work progress.
Tracking and recording of RFI and work progress on site.
Developing & executing maintenance plans to achieve optimum performance levels of all production & utility equipment in the plant, without any loss of production activity.
Inspection of Low voltage cables, their type wiring and voltage rating, meggering, and continuity test on cable drums. Monitor the Cables laid according to the specification, meggering and continuity to be done again after laying of cables.
Dressing and Splicing of cables, monitoring of Terminated the core with proper lugs, and overall cable inspection.
Check and verify the installation of field junction boxes, Analog & Digital cables Thermocouple cables.
Work on different types of (Foundation Field Bus) instruments.
Implementation of safety policy and plans for specific projects.
Meet the representative of the client and other contractors to improve the job and site safety to avoid incidents or accidents.
Coordination of monthly Safety meetings including setting agenda, taking minutes, and tracking follow-ups.
To attend routine shutdown for testing the installed equipment. Complete testing of protection relays carried out. Confirm tripping of the circuit breakers through relays using the test set.
Fault analysis and their rectification.
Wiring and as well as testing of Current Transformers (C.T) and Potential Transformers (P.T)