Experience:
Company Name -Mastoura Contracting Company Ltd For Saudi ARAMCO under Association of Total Refining and Gas Plant– Value -USD 578Billion General Manager(Projects) /Head Mechanical Dept.– Period from -August 2018–30 Aug 2020 1-Demolition of Slop oil Tank(Qty Ten), Fabrication of Tanks underground for storing the Slope oil and Gasoline (Shell with Internal Floating Roof) at(RasTanura Refinery)Saudi Aramco Saudi Arabia. a-Tie In – Procurement and Fabrication of Pipe spool and installation of 16”, 12” 10”8” 6”4” and 3” with Internal and External Floating Roof Coating of with Various dia of Gate Valves/MOVs –of 56”40”30”20” 12”,10”8”,6”,4”&3” for all Tanks and remote control to Operational unit at for flung . b—Demolition and construction of Earthen dike wall and construction of Concrete Dike wall all four side of Tanks. c-Construction of Sump pit and Laying of RTR Pipe incase of any Emergency Leakage of Gasoline and smooth transportation to another Sump Pit for its disposal according to ARAMCO Standard . d-procurement ,construction and testing of Electrical Cable 340 mm2, 70mm2,120mm2 and 240 mm2 and installation of Power panel and JBs with Termination e- Procurement & construction of various material required material for projects , Instrument cable 1, pair 2pair 4 pair 12 Pair, 16 Pairs also its termination to JBs and its testing for successful operation . 2-Cross country Pipe Line dia 20” from Booster Station #5 to Well side 886 and 863 at Abqaiq Saudi ARAMCO of Saudi Arabia and success full commissioning . 3-Installation of Analyser and Shelter with 2” SS pipe dia 2” above ground at Jubal- 2 for ARAMCO at Jubail ARAMCO. 4-Installation of 34.5 KVA TRANSFORMER and overhead power line FOR 21 Km at Hafar Al Batein Saudi Arabia. . 5- Installation of Flow line from Well Head -2275(Sub Contract –AL BARGASH Company Ltd –Saudi ARAMCO, Saudi Arabia) The Project is sub contracted to Al Bargash for getting project in operation before scheduled plan The Flow line 8” pipe (6.6 KM) from Thrust anchor to Thrust Anchor was awarded and the pipe laying U/G &A/G for various crossing which includes the crossing of overhead POWER line.
Activity includes from ROW, Stringing, welding, NDT, Hydro test, Coating, Holiday test, lowering pipe, back filling and bearming. 6- Managing theMechanical Engineering and Fabrication of Various pipe spools and Structural Requirement for ongoing projects. 7-Estimation, budgeting & planning for new and ongoing projects FOR ARAMCO 8-Installation of Jump over Line 10” Above Ground for SS 304/304L with Gate valve and check valve and various size of Fabricated Spool at WASIT Gas Plant . 9-Procurement of Material for various ongoing projects under ARAMCO.
Jul 2017 –Jul2018: Sterling Oil Exploration&Energy Production Company -Nigeria(Lagos) Senior Project Manager /Head Plant Operation Flow Station (OML-13)Under association of TOTAL REFENERY Value-USD-973Billion Period From -Jun 2017 –Jul2018: ● ● Development and implementation of Project Execution Plans for CAPEX projects assigned by NPDC. ● Development key project management(EPC) for In house Engineering and design ,Procurement of vessels and equipment ,Construction of Steel tanks and Pipe line for of Crude Oil ( Dia-40 Mtrs and Height 16 Mtrs (Qty 6),
● Procurement strategies with Logistic Support and client coordination . ● Interface Management between Program Management functions throughout the project life cycle for the CAPEX of .projects. ● Oversight of Program Management functions for compliance with cost, schedule and quality requirements for CAPEX projects assigned Role Overview; The following project Executed and managed successfully Flow Station-Aggu- Crude Oil after Exploration through(Upstream) flow line for Separation of crude oilGas and treated water .Crude oil is stored at Crude oil Storage tanks and further transported to its destination .(4000BBLPD) Installation of Flow Line(12 KMS)in water and forest(underground) - Separated Gas through GPU and relevantvarious Process are being smoothly transported to Flare and in plan to send to NGC Line Fabrication and Installation of Crude Storage Tank (Qty 4) for a storage capacity of 4000 BBLSD.(Dia40mtrsx16 metres)-Success fully fabricated and installed with Internal floating roof according to API 650/651 and commissioned Operation for flow station –Successfully managed the operation for crude oil export through SPM (Single point Mooring) Engineering Design (In-house).
Fabrication and Installation of Fire Water Storage Tank with Fire cabinets, fire hose reel and hydrants with valves and remote control Installation of CNG station –Successfully installed at following places and made operational of these CNG station successfully. 1- Aggu 2- Benku 3- Ndoni 4- Mud plant Construction of New Flow station of OML-13at IKOT Abbasi (Nigeria)- Construction /Installation of Flow line – Separation of Crude OIL, Gas& Water received from OML-13 Well head byvarious process and transporting the crude oil to Jetty to SPM for onward use.(The activity include civil , Mechanical, Electrical and instrumentation ) Fabrication and Installation of Crude Storage Tank (Qty -6) for a storage capacity of 2 MMBBLSPD.(Dia30 mtrsx20mtrs)-Success fully Fabricated, installed with Internal floating roof ,and commissioned successfully . Bin Quraya Holding Company Saudi Arabia as SrManager -Projects / (Oil &Gas)–ARAMCO project Under Associates with TOTAL( oil and Gas ) Value-USD-1563 Billion
Period From -July 2014 to Jun 2017
Key Projects Handled:
Title: Upgrade Gas Flow Capacity & AH Crude Oil Pipe Line-Jubail-2 (ARAMCO EPC up gradation)
Role:
Overview: The project Execution, Testing and Operation is managed as head Plant with the following responsibilities:
●
● Engineering Design, Procurement, Installation ,Testing Pre-commissioning, and Commissioning of:
o Sales Gas Metering Skid, it includes all Civil, Mechanical, Electrical and Instrumentation installation activity for smooth flow of gas to SATORP (Saudi ARAMCO &Total Refinery Project).
o Ethane Gas metering skid with all Civil, Mechanical, Electrical and Instrument activity for smooth transportation of Ethane Gas to SADARA (Saudi ARAMCO and Dutch Aromatic Petro chemical Project.
o Black Powder Filter Station with a capacity 350+20% scmmfd to filter the black powder, which includes the Cyclone Vessels, Cartridge Vessel , Push Pull Table, Overhead Gantry Crane and various Dia of MOVS & HOVs with all Structural, Civil Mechanical, In-plant Piping of various Dia (CS &SS), Electrical and Instrumentation with an stand by filter station
o Analyser Shelter with Gas Chromatograph for Methane, Ethane Gas Sampling System &Control of HVAC and FACP
o Installation Crude oil metering skid with pro0verand configuration of system remotely from control room .
o Water Injection to crude oil for desalting operation.
● Installation and successful operation of Marshalling Cabinet for Ethane and Sales Gas with a Configuration for OSPASS –ARAMCO
● Installation and Configuration of PLC (for Filter Station and Crude Oil separately for both) inside control building for OSPASS, Installation and Pre commissioning of Engineering work station with configuration for OSPAS
● Installation of Testing of Electrical, Instrumentation and CommunicationSystem with the configuration with EWS and OSPAS.
o Engineering Design, Procurement, Installation and Commissioning of Fire Alarm System with logical high sensitive smoke detectors in all control panel to have electronic control on system.
Operation Management-Successfully managed the operational activity of entire plant and provided suitable training to ARAMCO operation crew for best handling.
Gulf Consolidated Construction Company Ltd Saudi Arabia as Head-Projects / (Oil &Gas)–ARAMCO project(Under Associates of TOTAL Refinery) Period from -Jan 2007 –june ’2014: Value-USD-2078 Billion
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Title: SATORP (Saudi ARAMCO & Total Refinery Project)- Packege-8 (Period from Feb 2007 to Dec 2010) Value-USD 4750 BILLION
Installation of above ground Pipe Line ,Fabrication of Storage Tank , Loading ARMS, Construction of Coal Receiving Store hose and Installation of Conveyor belt for charcoal from Jubail -2 to Jubail Port(28 Km)
Overview: It aimed at managing and executing the JERP IK LSTK-EPCC project of SATORP atJubail –Saudi Arabia, a joint venture of Saudi ARAMCO & TOTAL France, with the initial available feed information and design provided by Technip).
Role: Executed with the following responsibilities:
● Performed the study & analysis of EPCC (LSTK) Project according to FEED for various stages of design (30%, 60%, 90% and 100%) for detail Engineering and Installation of various dia of CS pipe/SS pipe above ground on steel stricture8 Lines (total 240 KM) ( till Jubail port.)
Title: Crude oil/Water / Storage Tanks
Overview: Executed the Fabrication, Erection, Testing and Commissioning of Crude oil Storage Tank (Qty 06) /water storage Tanks Qty 06 (dia 44 mtrsx20.59mtrs)
Title: Cross Country Pipe Line (SATORP) to Jubail Port (EPCC)
Overview: The project was dealt with laying, testing and commissioning of CS pipeline, up to 24 “Dia(8 Line) (26 KM) for smooth transportation of various type of Gas from JERP to RasTanura Gas terminal and JERP to Commercial Port at Jubail (24” Pipe line -38 KM).This include with Installation of 6 Pump(Valve ) Station with Various dia and type of Valves.
● Administered and liaised with Client (SATORP) Proponent and GCC organization top management
● Management of Project Engineers/ Subcontractors for smooth execution and completion of project within schedule period
● Adherence of best safety according to SATORP standard and requirements all the time
● Responsible for provisioning and adherence of Quality assurance and Quality control throughout the Project according to SATORP standard and requirements.
● Installation and commissioning of:
o Various type of Diesel, and Electrical Pumps (Fire Proof) pumps of different capacity.
o Loading Arms, Air Filter and Truck Loading Scale for Molten Sulphur
Executed the Fabrication, Testing and Commissioning of Crude oil and Fire water storage tank of various dia and height.
● Highlight:
● Holds the merit for carrying out the Hydro Testing and Commissioning of entire Pipeline with an associate of all electrical &instrumental equipment and control of all Metering system and Black Powder Filter station PLC and to OSPAS .
Title: Cross Country Pipe Line (ARAMCO)(Install Sales Gas Pipe line(40”) from Khursania to Ras Al Khairand Extension to Ma”aden(Period-Jan 2011 to March 2012 Value-USD 1158 Billion
Overview: The EPC project aimed for managing and executing cross country FBE pipe line dia 40”from Khursania Gas Plant to RAS-AL-KHAIR and further to MA ‘Aden (102 KM)with Black Powder Filter station and Installation of Methane gas Metering Skid of 8”,20”and 24” for smooth and safe Transportation Of Sales Gas for MA ‘Aden/ALCO
Role: Executed with the following responsibilities:
● Installation, testing and commissioning of:
o Scrapper Launcher and receiver at Khursania Gas Plant, Ras al Khair and Ma’aden.
o Valve Stations With MOVs/EIVs/Gate Valves/Plug Valves/Check Valves of various size 8”, 16”20”24”30”&40”at various location for smooth flow of Gas
o Metering Skid of 8”, 20” and 24”
o HVAC and Fire Alarm System
● Installation,testing and commissioning ofBlack Powder Filter Station for three receiving station.
● Installation Testing and commissioning of:
o RTU/Air cooled System/Communication Tower,/ Distribution Transformer/ Dry Type Transformer/ 13.8KVA Overhead Power line/250 KVA UPS System/Cathodic Protection and configuration WRMU/RTU with OSPAS
o Instrumentation System of PIT &TIT and various Instruments for better monitoring and control.
o Civil work i.e. Construction of production building, pipe rack, pipe sleeper, pipe support and valves supports.
● Accountable for laying, Testing and Commissioning of FBE Coated CS pipe 40”/30”/24”/20”/16”/8” downstream main line /Kicker line, Blow down line with Installation of various type of Valves, Launcher and Scraper for 88 kmin sandy, sabkha and hard rock area, for underground and above ground pipe line to have easy transportation of Sales Gas to end users.
Administered and liaised with Client (ARAMCO) Proponent and GCC organization top management
● Management of Project Team / Subcontractors for smooth execution and completion of project within schedule period
● Adherence of best safety according to ARAMCO standard and requirements all the time
● Responsible for provisioning and adherence of Quality assurance and Quality control throughout the Project according to ARAMCO standard and requirements.
Highlight:
● Holds the merit for carrying out the Hydro Testing and Commissioning of entire Pipeline with an associate of all electrical &instrumental equipment and control of all Metering system and Black Powder Filter station PLC and to OSPAS.
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Role: Executedand managedthe following
● Installation and commissioning of:
o Various type of Diesel, and Electrical Pumps (Fire Proof) pumps of different capacity.
o Loading Arms, Air Filter and Truck Loading Scale for Molten Sulphur
Executed the Fabrication, Testing and Commissioning of Crude oil and Fire water storage tank of various dia and height.
● Highlight:
● Holds the merit for carrying out the Hydro Testing and Commissioning of entire Pipeline with an associate of all electrical &instrumental equipment and control of all Metering system and Black Powder Filter station PLC and to OSPAS .
Title: Cross Country Pipe Line (RasTanura to Berry GasPlant-Saudi Arabia )-Install 30”CS pipe line from RasTanura to Berry Gas Terminal (EPC Project) May 2012 to Jun 2014 Value-USD -576Billion
Overview: The project was dealt with laying, testing and commissioning of CS pipeline, up to 30”dia for 132 Kms for smooth transportation of Sales Gas from RasTanura Gas terminal to Berry Gas Terminal Jubail This include with Installation of (Valve ) Station with Kicker and blow down line with Various dia and type of Valves.
● Administered and liaised with (ARAMCO ) Proponent, End users and GCC organization top management
● Management of Project Engineers/ Subcontractors for smooth execution and completion of project within schedule period
● Adherence of best safety according to ARAMCO standard and requirements all the time
● Responsible for provisioning and adherence of Quality assurance and Quality control throughout the Project according to ARAMCO standard and requirements.
● Highlight:
● Holds the merit for carrying out the Hydro Testing, Pre commissioning and Commissioning of entire Pipeline with an associateof all electrical &instrumental equipment and control (Manual and remote )of PLC and to OSPAS . Jan ’05 – Dec 06’: National Gas Company (SAOG), Sultanate of Oman as Projects Head Value-USD 832 million
Key Project Handled:
Title: Saud Bhawan Automotive LLC Project for Pipeline at Sohar, SUR. &Nizwa
● Roll Overview: with the construction and distribution of Gaseous System for centralized distribution of LPG Gas for domestic and Industrial uses. Looked after the procurement and supply of materiel as per approved ROP and MAS (Material as Specified in Standard) and consultants. Development of engineering core team for its consistent application across the contract’s to have the best prospects of business. The promotion and support of continuous improvement activities within all aspects of the business under engineering and championing this activity on the Contract.
MEP Projects at Sohar Palm Garden
● Executed and managed the Engineering Procurement and installation of Master gas vessel, HDPE PIPE of various dis GI pipe and Copperpipe for installationand smooth supply of domestic pipe line gas to 550 flates /Bungalows and Commercial Establishments .
● Also executed the centralised HVAC and Power connection for Entire Establishment. Aug 2003 – Dec2004: Unitech, Delhi, India as Regional Manager (Project) P M C (EPC)/ Cross Country Pipeline - (80 Km of 30”CS Pipe line)
Key Projects Handled:
Title: Bharat Petroleum Corporation Ltd./Sabarmati Gas Ltd. Projects ( UP/Down stream)
Overview: Carried out and managed the responsibilities for the smooth distribution and supply Piped Natural Gas to various Industries/City Gas distributions at Himmat Nagar (Sabarkntha) Amber, Kalol (Mahesana) Gujarat. The activity includes the procurement and supply of material Engineering design for pipe, valve sizes and regulator station also lying of various dia pipes (C/s. Poly ethylene provision of safety measure, Quality control as per International standard, testing and commissioning of complete network within the scheduled period.
Engineering Design –successfully executed the Engineering for smooth Gasflow for domestic and Industrial user.
Operation &Maintenance –Managed the operational and Maintenance activity for smooth flow of piped Natural gas for end users. Title: Reliance Industries Ltd. (Cross Country Pipe Line) Position Held-Project Manager
Overview: Carried out the execution, laying, hydro testing and commissioning of cross country pipe line dia 56”(Up Stream) from Shahapur (Pune) to Kalyan and from Kalyan to Wapi for 382 km with construction various size of six Valve station (Pump station) with all required parameters and standard for Reliance Gas Transportation and Infrastructure Ltd. according to Moody International
Title: Heavy Steel Structure
Overview: Managed the Fabrication & Erection of Heavy Steel structure for various dia of Vessels and heavy Equipment for Reliance Petroleum Ltd. at Mega PP Site at Jamnagar India
Title:
Pipe Rack
Overview:Construction of pipe rack up to a height of 12 Mtrs for five kilometres at Essar Construction Ltd., Jam Nagar Gujarat, India for installation of 40” pipe line.
OCT ’95 – Jun 03: Mahanagar Gas Ltd., Mumbai, India as Position Held- Project Manager (PMC) A joint venture with British Gas Ltd., UK
Key Project Handled:
● 06 Project of Mahanagar Gas Ltd., Mumbai India (PMC) of domestic & industrial gas distribution (Down Stream) for smooth transportation of Natural Gas with all requisite quality& safety adherence. Responsible for laying of various types of Pipeline such as CS / PE of various Dia up to16”, testing and commissioning for unrupted flow and smooth distribution of domestic and industrial supply of piped Natural Gas.
Commenced career with Indian Air Force from Sep’79 to Aug’95
Career Path:
● Served as a Technical Officer (Armament, Missile of Fighter Aircraft &Engineering), Administrative In-charge(Unit Adjutant), Engineering In-charge and Unit Commander at various duty station of posting places. Took Volunteer Retirement as Flight Lieutenant due to sudden demise of Father .
Balmukund Shukla
Date -30 Jul 20
Place- Ras Tanura Saudi Arabia
M#+...048
Education:
EDUCATION & CREDENTIALS
1979 BSC(Biology and Chemistry) Allahabad University -UP Secured 84%
1985 B.E. (Mechanical) Institute of Indian Air Force- Secured 73%
1999 Diploma in Technology Institute of Indian Air Force Secured 90%
1998 Diploma in Basic Computer Indian Institute of Management and Services) Secured 86%
1997 PG Diploma in Industrial Management Indian Institute of Management and Services) Secured 89%
1994 Master Business Administration (Management and Planning) Jodhpur University Secured 94%
Balmukund Shukla
Date -30 Jul 21
Place- Ras Tanura Saudi Arabia
M#+...048
Skills:
A reputedHead Projects/General Manager(Projects) with significant experience in driving overall Operations (in sync with the macro organisational plan); inclusive of defining the roadmap, budgeting, technology evaluation & evangelisation, site management and execution of multi-million dollar, multi-location projects. History of concurrently directing multiple & large size assignments in diversified sectors (Oil &Gas/MEP) to successful completion through effective management and team collaboration; continually strives to produce high quality projects while adhering to a tight schedule and budget. Proficient in planning & executing construction projects involving method engineering/method statement, contract administration/Vendor development and resource planning with a flair for adopting modern construction methodologies/techniques. Strategic problem-solver who envisions smart solutions and executes with urgency across all levels of the organization; Hands-on leader with extensive customer service experience who is able to keep teams focused and productive.
TOTAL 30+ YEARS PLAYING THE ROLE OF PROJECT MANAGAER
Areas of Expertise:Project Management |Plant& Operation Management | Strategic Planning | Business Operations | Turnover Management | New Setups Management | Progress Monitoring | Costing & Budgeting | Engineering Design | Procurement Management |Fabrication and Installation /Pre Commissioning | Commissioning | Site Management | Construction Management | Training Specialist | Relationship Building | Liaising & Coordination | P&L Accountability | Safety Adherence | Contractors Management | Civil / Mechanical / Electrical and Instrumentation | Human Capacity Development | Problem Solving Skills | Business Development | Quality Assurance | Administrative Management | Procedures & Recognition | Team Work & Leadership | Presentation Skills | Communication Skills GLOBAL SPAN: Middle East Countries – Oman and Saudi Arabia/SINGAPORE/EUROPE(FRANCE/NEITHERLAND&MANCHESTER) DOMAIN EXPERTISE: Refinery, EPC, Infrastructure, Oil & Gas, Construction, Electro Mechanical Projects (MEP) and Service Projects
Career Highlights include:
● Holds the distinction of overseeing Engineering and Design from FEED of JER IK LSTK-EPCC project of SATORP (Saudi ARAMCO and Total Refinery Petrochemical Company France) at Jubail –Saudi Arabia/ARAMCO & NPDC (Nigerian Petroleum development Corporation Ltd with the initialavailable feed information.
● Stellar in designing/Procurement/Construction and Operation for /TOTAL OIL ,ARAMCO EPC –LSTK Projects of cross country pipe line at various locations in Saudi Arabia viz. ARAMCO/SATORP(France Neither land Manchester in Europe /at Saudi Arabia ,National Gas LLC at Royal Sultanate of Oman/NPDC Nigeria, Reliance Industries Ltd , BPCL, Sabarmati Gas Ltd. And Maha Nagar Gas Ltd at India. Expertly developed scalable solutions that dramatically improve efficiency, productivity, and profitability with a demonstrated ability to define and map the project scope, specifications, project timeline, resources, and budget requirements from point of planning through production in both traditional and virtual business environments. Cross-cultural leader with strong exposure in strategic & financial planning for start-ups, complex restructuring, expansions, large scale business transformations and business and Management advisory roles.
●