Resume Construction Manager in Monaco Monte-Carlo

Construction Manager
Engineer - Technologist
4500 £
Monaco (Monte-Carlo)
11-07-2023
Contact person: Afzal Ansari-PMP
Country of Residence: New Zealand
Age: 46
Phone number: show
Biometric passport
Experience:
Resume Afzal Ansari-PMP Construction Manager Total Experience 21 Years- (India 2years- Abroad 19 Year) Email-: [email protected] Contact : Majuro Mob +...5 WhatsApp’s +...133 Available : Immediately Professional Snapshot Highly competent with Bachelor degree in Mechanical with Overall 21 + Years International Experience in Engineering, Procurement, Construction Management, Highest Safe work procedure SHES, Managerial Management, Planning, Scheduling, Execution Controlling, Resources Mobilization resources, Cost Controlling, Monitoring Overseeing Quality Control to ensure the highest Quality as per PQP and Closing, Project Management as “PMC” EPC “EPCM” in field Oil & Gas Petrochemical in field of Green & Brown- Project in Refiners Projects/ Natural Gas Liquefaction / Onshore gas developments project/ GTL Project and LNG. Manage the all-construction activities like Maintenance /Revamping Brown Field, Storage tanks Installation Pipeline, Piping, Steel Structure Erection, Installation of Rotating & Static Equipment, (MC) Mechanical Completion- Pre-Commissioning & Commissioning, Educational Qualifications : • Bachelor Engineering in Mechanical Engineering • Course in "Piping Engineering” conducted by Piping Cell, CAD Centre, Mumbai. • AutoCAD from Mumbai CADD Centre. • Using 3D Software Professional Qualifications / Courses Attended : • PMP@PMI- Number 2787559. • Project Management Professional • Safety Training Course from OSHO • Primavera P6V8 • Driving Licence -Saudia Arabia Valid • Vaccinated 3 dosages completed. Experience Summary: Current Employer : Pacific Engineering Company LTD. New Zealand Base. From To Project : MEC-Fuel Oil Tanks Farm Refurbishment Project Client : Marshal Engineering Company Position : Construction Manager Nov. 2022 Onward Project Value USD-28930000 Scope of work: - Design, Procurements, Fabrication, New Tank Constriction, upgrade Existing tank Pipe, Painting New routing Pipeline, Firefighting, & alarm system, Heavy Equipment installation, E&I, SCADA, Process New established Controlled Building, Responsibility: • Design-Bid-Build and Design/Build contracts. • Pre-Design/Design Phase, Scheduling, Planning, Value Engineering, Constructability and Phasing Review. • Construction Period Phase Establishing temporary field offices, Monitoring project financial data and budgetary cost accounting, • Construction Phase scheduling, Progress Meetings, Assisting in issue resolution, Testing and Inspection Services • Commissioning, Performing additional construction-related services,Claims Analysis and Resolution Services. • Planning Supervision on timely issued the conceptual design, Preliminary design, Details Design. • Reviewing project plans and specifications, scheduling, costs saving, discrepancies, potential construction problems, etc. • Planning, Scheduling, Supervision, Execution Monitoring and Controlling, Closing, • Planning of Design delivery, Procurement, Resources Mobilization planning, • Manage all Construction activities to ensure completion work in accordance with Design, Code & standard within time, under budget and as per project safety Procedure, targets of 0 LTI, • Controlled the Budget, Schedule, Controlled Quality, Controlled Cost, Controlled the Procurement, and Controlled the Construction Productivity. • Make sure Timely approval of Method of statement, JSA, Pre-Execution plan, MAR, MRIR, Project Schedule, WPS and Construction Procedures and ITP’s • Ensure that methods of work are up to date, efficient and in accordance with company and client safety policies and Health and Safety. • Implement the safe work culture on site and participate in Weekly safety mass meeting, Daily tools Box meeting on the job site. • Organized the project internal progress meeting and resolve site problems. • Organized the weekly MOM meeting with client and discussed the site issues and problems and solving the problems. • Regular meeting with Controlled Vendors/Bidders/Partners/Sub Contractors and discussed Progress and issues and resolve the Issues. • Manage all construction executing activities related planning, Scheduling, Civil/Piping/ Mechanical/E&I contractor evaluation, contractor management, team management supervision, reporting and forecasting (physical and financial) on all aspects of the site construction phase of projects from constructability review through to mechanical completion (MC). Other responsibilities. • Managing the project delivery process across multiple projects and programs to achieve the client's requirements. • Chairing project meetings with clients and consultants. • Develop detailed construction sequence and schedule to maximize the efficiency of on-site contractors, based on the forecast availability of equipment and engineering deliverables. • Manage the site construction supervision team and set daily priorities in accordance with overall project schedule. • Plan the mobilization of assigned construction contractors and necessary tooling/equipment to ensure they are mobilized in line with agreed schedules. • Delegate tasks to the construction supervision team to effectively manage project needs and deadlines. • Regularly review all aspects of project progress, ensuring compliance with contractual requirements, construction, and safety codes and standards. • Make sure establish the work according to Project quality plan and avoid the rework. • Compared the Daily weekly and Monthly productivities according to schedule, check the deviation and take corrective action. • Ensuring the project completed on time under budget, • Controlled the Schedule, Quality, Controlled Cost, Procurement, & Resources. • Manage procurement of all construction equipment, including outside rentals. Manage jobsite equipment inventory up to and including return of equipment internally or to external vendors. • Engage with the client Coordinators and participate with the development of the project construction plan, including the advisement of installation, inspection and sell-off activities. • Procure and maintain all required craft manpower levels to support project budget and construction schedule. • Develop and manage hiring plans and manpower forecasts. • Oversee daily timesheets and recommend/confirm overtime work requirements exceeding the project plan. • Monitor the actions derived from the interdisciplinary coordination meetings in their area of responsibility (Engineering, Procurement, Construction, HSE, OHSE etc.) • Promote the optimization of designs and coordinate the consistency analysis of Engineering in their area of responsibility. • Ensure consistency of engineering drawings in his area of responsibility • Develop and refine the strategy for stake holders’ engagement to support projects progress in compliance with applicable regulations and key stake holders’ expectations. • Ensure that a plan is developed which addresses the challenges and issues of the first in kind project as the biggest complex designed and built in a single phase ever on the globe. • Ensure that Design and Constructability reviews are performed to integrate design and construction considerations assuring a technically complete and constructible design. Assure complete participation and alignment of all project participants involved. Previous Employer : Tecnicas Reunidas EPC Project - Saudia Aramco –Saudia Arabia From To Project : CFP/Clean Fuel Project Rastanura Saudia Arabia Client : Saudi Aramco Rastanura Position : Construction Manager Dec.2020 Oct-2022 Project Value USD -1.2 Billion Scope of work- • 425,000 Inch Dia of Piping0 • 1,500 Tons of Steel Structure • 1,200 Tons of Pipe Supports • 10,000 Tons of Static & Rotating Equipment erection • Electrical & Instrumentation Works (650 KM of cables and cable trays, 25,000 instruments etc.) • Civil -Excavation – Concrete Foundation, Pipe rack, Tank Foundation, Control Building. Responsibility: • Manage all Construction activities to ensure completion work in accordance with Design, Code & standard within time, under budget and as per project safety Procedure, targets of 0 LTI, • Submit Document to the client for approval like Method of statement, JSA, Pre-Execution plan, MAR, Microprojects Schedule, WPS and Construction Procedures and ITP’s • Monitor Material (MTO)Take Off activities, find out irregularities and shortage, take corrective action as required. • Controlled the Schedule, Controlled Quality, Controlled Cost, Controlled the Procurement, Controlled the productivity, and CPI, • Proper monitoring Project and utilized KPI’s and Constructability • Implement the safe work culture on site and participate in Weekly safety mass meeting, Daily tools Box meeting on the job site. • Assist the Contractor and subcontractor(s) in the implementation of site-specific SHES programs to meet safety improvement strategy & objectives, emergency response and evacuation drill programs. Participate in incident/accident investigation under the SHE Coordinator in the area. • Site issues and raise technical queries for required modifications, as necessary. • Guidance to the project team to ensure that the project meets objectives. • Maintaining strict quality control procedures - regular testing of materials, inspections of work – visual and through testing equipment/ methods, conducting regular site safety checks etc. • Ensure coordinated and synchronized effort of - external stakeholders like Project Management Consultant (PMC), Managing Engineering Consultant, Third Party Inspection Agency, Construction Contractor – at site level. Ensure documentation. • Review, comment, and approve construction execution and related procedure specifications, and deliverables prepared by the EPC CONTRACTOR • Facilitate periodic meetings with the PMT and contractors as necessary • Ensure correction of non-conformance report items and other issues supporting QA/QC compliance. • Review the contract tendering document to make sure through understanding of contract requirement. • Contributes to the 90 days and 6-weeks look-ahead plans and implements work in agreed sequence. • Monitoring on subcontractor and resources planning and mobilization allocation. • Controlled & provide the as per require necessary guidance and support to the Site. • Ensures that the constructability process is implemented in the design phase and ensure participation of construction personnel in all project model reviews. • Controlled the EPC subcontractor, contracts, and records all changes in accordance with Management of Change procedure. • Controlled Vendors/Bidders/Partners/Sub Contractors • Maintaining close liaison with the Client team to promote good relations. • Participate various Review construction meetings with Subcontractors, Vendors, Stakeholders. • Review Daily progress report Daily manpower report prepared by contractor for adequacy as per construction schedule. • Analyze the risk and mitigate risk of each discipline. • Review man-hours and duration forecasts to completion for construction and installation durations and resource requirements which are submitted by Contractor. • Supervision on Issue of drawings from design department, Procurement of site bulk materials and delivery, Delivery of equipment as per schedule, Inspection and expediting activities, • Control the subcontractor resources are sufficient availability and working condition. • Organize the progress & construction weekly meeting with Contractor and discussed for progress & site issues and resolve. • Controlled the contractor and closed the Punch point & Prepare for Hydro Test and “MC”-Pre-Commissioning, Commissioning as per schedule. • Prepare Tie In Package, and schedule for Tie In work, Make sure availabilities of Tie In check List, Blind List, Spools Fabrication and fitting Items List, Tools and Tackles as per each tie in. • Prepare schedule for hot/Cold taping and mark on location according to tag numbers. • Planning & Supervision work on All type of Equipment Erection, Rotating Statics and Steel Structure erection according to the programmed Schedule. • Make sure timely completion of Equipment Installation like Pressure Vessel, Distillation Column, Absorber, Scrubber, Exchanger, Piping Fabrication & Erection Underground /Above ground piping, Tie In work , Equipment Installation Statics Vacuum Column-Pressure Vessel ,Fractionator ,Distillation Column , Heat Exchanger, Splitter , Absorber Fin Fan, Compressor, Motor & Pump, Exhaust, Electrical Cable laying U/G & AG, Instrumentation Tray work, Light work & Commissioning, • All field mounted electrical equipment DB’s lighting installations Cable Puling Continuity & meagering Test Cable glanding terminations cable tray many types of Tray work Like Ladder , Punching, Ducting Installation All Types of support Panel Frame JB. Frame Lighting Support Lighting Pole & Light Installation and Cable Tray Support Erection and Fabrication conduit rigid PVC installations switchgears, transformer ’Motor, (MOV) Motorize PLC, MCC installations and cable glanding and terminations, HV, MV and LV switchgear installation, pre-commissioning and commissioning with testing. Different type of electrical testing equipment • Supervision on Civil activities Excavation concrete, Backfill, shuttering, steel Binding & Steel Structure Erection as per schedule. • Control the Civil work Earth work grading, embankment work, exaction for concrete foundation, Concrete pipe rack, Tank foundation, steel structure foundation and concreting, Soil Marl Back fling compaction and inspection, Reinforcement rebar, Shuttering /Form work, and painting work, • Controlled the tank installation, Timely materials Issued, Approval and inspection. • Make sure timely completion of tank welding backlog, NDT Clearance and Inspection, Foundation Load testing, Tank Base Plate Anural plate, Rectangle plate, Shell Course plate, Rafter & Support, Tank Roof plate inspection and Installation, • Controlled the contractor and closed the Punch point & Prepare for Hydro Test and “MC”-Pre-Commissioning, Commissioning as per schedule. • Review of project Risk register, Planning of commissioning process, Mechanical completion, Examination of P&ID, Pre-Commissioning of system, component or equipment, Commissioning, Previous Employer : JGC Corporation EPC Project Algeria- Africa From To Project / Position / Relevant Technical and Management Experience Oct. 2018 Nov. 2020 Project : HMD-South Revamp EPC Project- Brown Field LNG Client : Company Sonatrech Position : Construction Manager Responsibility : • Planning, Scheduling, Supervision, Execution Monitoring and Controlling, Closing, • Manage all Construction activities to ensure completion work in accordance with Design, Code & standard within time, under budget and as per project safety Procedure, targets of 0 LTI, • Controlled the Schedule, Controlled Quality, Controlled Cost, Controlled the Procurement, Controlled the productivity, and CPI, • Make sure Timely approval of Method of statement, JSA, Pre-Execution plan, MAR, MRIR, Project Schedule, WPS and Construction Procedures and ITP’s • Implement the safe work culture on site and participate in Weekly safety mass meeting, Daily tools Box meeting on the job site. • Provides construction direction and control of one or more assigned projects within an area of project management operations, and preplanning, scheduling, execution, and close-out of these projects. • Reviews and analyzes correspondence relating to project planning, critical path plan, project proposal, estimates, item lists, drafting schedule, site plan, foundation plans, construction methods and materials, general arrangement of equipment and piping specifications and scope of work; develops data and information. • Participate in the detailed construction schedule, or critical path plan based on complete drawings and material delivery schedules; estimates or verifies estimates for contract labor, senior staff labor, shops labor, motor equipment, construction equipment and field materials; compares estimated construction cost with balance of appropriation; and initiates a request for a project re-estimate or supplements appropriation for any indicated over-run. • Analyzes project for Contract and Service Organization manpower breakdown and assists in drafting detailed contract Scope of work; reviews prepared Contract Fair Price Estimates; participates in contract explanation; reviews bids and recommends contractor selection method. • Selects and directs layout of material yard; initiates material requests, tools and equipment orders and work orders; and performs similar work required to start construction and initiate subsequent • Coordinates and controls project construction by continuous inspection of work progress. He checks for quality, workmanship and conformance with plans and specifications; inspection and review of material status, review of expenditures vs. progress status; review and analysis of time sheets, overtime reports, equipment usage reports, material usage reports and similar actions essential to assuring the construction schedule is met and that the work conforms to plan; and recommends and initiates corrective action. • Prepares and negotiates either miscellaneous work order contracts or amendments to contract to cover either additions or deletions to the Contract Scope that may develop during the course of construction. • Compiles or directs the compilation of various reports pertaining to project activities such as, project pictures, monthly narrative status of construction, contractor performance reports, damage to material or equipment, accident, personal injuries and financial status reports. • Certifies the accuracy and validity of documents such as contract payment authorizations, material transfers, and equipment usage and overtime reports. • Checks out the completion of construction; verifies that tests and inspection are complete; checks that final clean-up and removal of excess material arranges acceptance meeting and obtains necessary signatures on Acceptance Report; notes any exceptions and takes corrective action on items within scope of work or as required by code; analyzes charges for accounting and aids in accounting reconciliation including final inventory. • Provides work direction to Service Organization, Vendor Representative and contractor representatives. • Apply necessary measures on projects controls, safety, quality and integrity. Ensure ready access to project site to those who are involved in project construction and assist in obtaining work permits. Work as job expeditor for better construction efficiency. Manage project close out and signing of MCC • Controlled the contractor and closed the Punch point & Prepare for Hydro Test and “MC”-Pre-Commissioning, Commissioning as per schedule. • Controlled the tank installation team, Timely materials Issued, Approval and inspection. • Make sure timely completion of welding backlog, NDT Clearance and Inspection. • Prepare Tie In Package, and schedule for Tie In work, Make sure availabilities of Tie In check List, Blind List, Spools Fabrication and fitting Items List, Tools and Tackles as per each tie in. • Make sure completion the timely Civil work, Electrical & Instrumentation, • Planning & Supervision work on All type of Equipment Erection, Rotating Statics and Steel Structure erection according to the programmed Schedule. • Make sure timely completion of Equipment Installation like Pressure Vessel, Distillation Column, Absorber, Scrubber, Exchanger, Piping Fabrication& Erection Under Ground Above Ground, Tie Inn work, Equipment Installation Inspection, Electrical Cable laying U/G & AG, Instrumentation Tray work, Light work & Commissioning, • Supervision on Civil activities Excavation concrete, Backfill, shuttering, steel Binding & Steel Structure Erection as per schedule. Previous Employer : Saipem ENI - Kizomba Satellite Phase Angola Africa From To Project / Position / Relevant Technical and Management Experience Sept. 2010 Feb. 2015 Project : Kizomba Satellite Phase-I & II –Offshore Project Client : ExxonMobil Position : Construction Manager Pipeline Project Crude oil Pipeline transportation system 40 KM 30’’ API 5L-X52 Responsibility: • Implement the safe work culture on site and participate in Weekly safety mass meeting, Daily tools Box meeting on the job site. • Manage, control and execution of project to effective completion and delivery within the constraints of time, cost and quality with safety. • Manages and executes assigned projects in accordance with the requirements of the contract among the company, client, and company’s operating policies and principles. • Review FEED checking and Detailed design Pipeline scopes and related deliverables • Verify the conceptual design, Preliminary design, Details Design, • Make sure Timely approval of Project Documents, Method of statement, JSA, Pre Execution plan, MAR, MRIR, Project Schedule, WPS and Construction Procedures and ITP’s • Preparation of Pipeline mechanical calculations • Review of project Risk register, Planning of commissioning process, Mechanical completion, Examination of P&ID, Pre-Commissioning of system, component or equipment, Commissioning, Pre-Startup Safety Review (PSSR), Plant Startup, • Monitor Material Take Off activities, find out irregularities and shortage, take corrective action as required. • Make sure Timely issued the materials, Random pipe, Coordination Drawing, Layout Drawing. • Arrange the Construction Staging Areas & Storage Yards. Clear prepared the ROW. Excavating the Trench. Pipe Transport, Stringing, & Assembly, • Checking of Pipeline Crossing matrix Roads Crossing, Cable Crossing, HDD (Horizontal Direction Drill) • Executes the work in accordance with the quality standards and requirements specified for the project. • Prepares for engagement reviews and quality assurance procedures. Minimizes our exposure and risk on project. • Controlled the subcontractor & Supervision work on Civil, Mechanical, Pipeline/Piping E & I • Managed site through effective quality control, follow up and coordination with clients, PMC/PMT, consultants, sub-contractors, and other concerned departments. • Checking of Pipeline specialty Items specifications, data sheets, Material requisitions Scrapper launcher and receiver, barred tee, Line pipe, scraper, induction bends, full bore ball and through conduit gate and check valves, isolating joint, pipeline flanged, fittings, chemical injection quills, Corrosion coupons, • Arrange proper and timely apply Internal FBE / FJC coating and inspection, External Holiday Test of pipeline. • Manage all vendor documents for specialty items such as Scrapper launcher and receiver, barred tee, Line pipe, scraper (intrusive and non-intrusive), induction bends, full bore ball and through conduit gate and check valves, isolating joint, pipeline flanged, fittings, chemical injection quills, Corrosion coupons, etc. • Keeping awareness to execution team, relevant monitoring framework, legislation changes, initiatives and promote to direct reports. • Preparation of Pipeline survey Scope of work • Make sure timely approval JSA, Pre-Excavation Checklist for constructions, quality control procedures, material submittals and approvals. • Prepare pipeline related technical reports like route selection, valve station location selections, • Implement the safe work culture on site and participate in Weekly safety mass meeting, Daily tools Box meeting on the job site. • Monitor and assist the Contractor and subcontractor(s) in the implementation of site-specific SHE programs to meet safety improvement strategy & objectives, emergency response and evacuation drill programs. Participate in incident/accident investigation under the SHE Coordinator in the area. • Review and approval of master schedules, monthly progress reports, interim payments, variation claims, time extension claims and settlement of final accounts with the consultant and client. • Update daily progress and compared the target and find out the deviation. • Study pre-qualification of sub-contractors and review their capabilities as per requirement of projects, review sub- contractors, supplier’s quotations and prepare sub-contractors, suppliers agreements. • Deployment and identifies the resources and plan in time, and assigning, bringing optimum utilization of resources- labor, materials, and equipment, and ensuring their procurement at most cost-effective terms. • Manages day-to-day operational aspects of a project report, scope & Periodic inspection of construction sites. • Review of project Risk register, Planning of commissioning process, Mechanical completion, Examination of P&ID, Pre-Commissioning of system, component or equipment, Commissioning, Pre-Startup Safety Review (PSSR), Plant Startup, • Controlled the al stake sub-contractors and Third party & suppliers. • Prepares for engagement reviews and quality assurance procedures. Minimizes our exposure and risk on project. • Supervision on subcontractor and make sure sufficient availabilities of Resources and Materials on site. • Proper implement HSE procedure on site as per COMPNY requirement Previous Employer : Lahoud Engineering at -EPCM- Abudhabi- Middle East From To Project / Position / Relevant Technical and Management Experience June 2006 May 2010 Project : OGD Plant (GASCO) Project- Brown field LNG Project Client : GASCO Position : Construction Manager Piping Responsibility : • Ensure time, costs, quality, safety targets are met, through direct coordination and management of a project construction team, interfacing with project organization, subcontractors, suppliers and clients • Ensure adequate support to project management Team in defining, monitoring, and updating project execution plans. • Participate in defining the overall project planning and scheduling for construction activities, with the support of the expertise of construction organization key positions. • Ensure that the activities are carried out within the planned time and costs, coordinating, and instructing the construction team accordingly and intervening with corrective actions in case of deviations or difficulties. • Coordinate to Engineering department to timely approval for IFB/IFC Drawing, • Coordinate to Client material section for approval for MIR, MTO, • Make sure for MRIR timely inspection, • Make sure timely completion of Equipment Installation like Pressure Vessel, Distillation Column, Absorber, Scrubber, Exchanger, Piping Fabrication & Erection U/G, A/G Metal CS, SS, Alloy GRE, GRP, GRV, • Fabrication Erection, Support Erection, Welding completion, Test Pack Attend Clear Punch Point A, B &C according to timeframe. • Coordinate to Q/C Department to timely clear the NDT, RT, PT, PMI & DPT • Controlling the scope and update Schedule Mile stole, Gantt chart • Estimate the Resources manpower build a construction plan. • Planning for 3 months looks ahead, Scheduling, Execution Controlling, Scope of work Controlling, Cost controlling, Time & Quality Control, Risk Control, and Closing • Analyze all information regarding the progress of the work, indicating the causes of deviations between the program and the work carried out and propose solutions and/or request instructions to overcome these problems. • Support the preparation and implementation of effective project execution plans and procedures • Monitor engineering design compliance to the Design Basis • Manage a defined project scope to schedule and budget • Coordinate cross discipline input into procurement and contract technical packages assigned to their area • Monitor design evolution from basic engineering to detail engineering for documents and drawings and mitigate interdisciplinary conflicts • Review Piping/ pipeline and piping design basis and ensure its full compliance with project specification and Scope of Work • Mechanical Completion-Checking and testing of equipment and construction to conform that installation and construction is completed according to approved drawing, Procedure and codes. Inspection of mechanical completion as NDT done, Piping support completed, Flushing leaning, Blowing, Chemical Cleaning, Drying, Reinstatement, Bolt tensioning, Insulation done, Structure all support is completed. Electrical and support cable tray, cable tray support, cable filling, wiring and grouting done. • Ensure effective interdisciplinary coordination verifying adequacy and consistency of construction strategies. Take necessary technical decisions in case of unresolved conflicts between disciplines, ensuring the optimization of construction. • Ensure and coordinate the mobilization and demobilization of the assigned resources, in accordance with the project planned time frame and project needs. • Coordinate the execution of multidisciplinary construction activities and manage activities assigned to subcontractors, providing the guidelines for the execution of the works, and monitoring the adequacy of manpower and equipment to face the construction activities. • Give technical support to project management to evaluate any variation requests. • Ensure the achievement of the established construction milestones, including the mechanical completion objectives. • Manage the interfaces with the Client for all the matters relevant to construction activities! • Manage the interfaces with engineering departments for drawings and materials availability. • Ensure that the lessons learnt for construction are clearly identified, granting the monitoring of plants performances to capitalize experiences, and identifying areas of improvement. • Ensure the continuous planning of construction activities. • Ensure/manage the Mechanical Completion activity by "System and Sub-System" as clearly identified monitoring the schedule, Quality certification, punch list, up to final handover to Commissioning/Client • Controlled the contractor and closed the Punch point & Prepare for Hydro Test and “MC”-Pre-Commissioning, Commissioning as per schedule. • Planning and scheduling of Pre-commissioning, Commissioning activities, Perform Installation, Inspection, Hydrostatic, system make ready to Mechanical Completion, Pre-commissioning, System checking as P&ID, Site modification, Internal Inspection of tank/ equipment / vessel, Flushing , air blowing of piping including gasket, blowing, purging of system using nitrogen gas, leak test H/L Pressure, calibration of instruments, checking of electrical equipment for proper earthling, Instrument, Electrical, and Motor loop testing, Punch the system and close ongoing process, • Conducting operability test on individual equipment/ system, charging of lubes system • Fabrication and supply of temporary facilities such as temporary bypasses spools, blinding, jump over, vent for pre-commissioning activities, calibration of instrument, Catalyst loading in the reactor, Package of distillation column, Installation of filter, Loading Catalyst, Vender and Factory accept test • Define monthly construction work-front studies based on Engineering/Procurement data and Site conditions to support. Previous Employer : Samsung Heavy Engineering. at Saudia Arabia- Middle East From To Project / Position / Relevant Technical and Management Experience March. 2000 April 2005 Project : Ibn Zahr Jubail Saudi Aramco Refinery- Brown Field Client : Saudi Aramco Position : Piping Engineer Responsibility : • Guidance to the project team to ensure that the project meets objectives. • Maintaining strict quality control procedures - regular testing of materials, inspections of work – visual and through testing equipment/ methods, conducting regular site safety checks etc. • Make sure timely completion of Equipment Installation like Piping Fabrication & Erection U/G ,A/G piping, Tie Inn work , Equipment Installation, Prepare for Hydro Test and “MC”-Pre-Commissioning, Commissioning as per schedule. • Upload and issue the List of Teams in his area and keep it updated periodically, ensuring that each Discipline uploads and updates its part according to the responsibility matrix. • Monitor the actions derived from the interdisciplinary coordination meetings in their area of responsibility (Engineering, Procurement, Construction, HSE, etc.) • Responsible for the follow-up and closing of the actions derived from the reviews of HSE Hazops, SIL, etc. and coordinate the closure of Customer Comment Tags from Model Reviews. • Coordinate the Plans and Activities Program Plan in their area/unit of responsibility. • Lead, in the absence of the Project Area Manager, the weekly coordination review of Changes in P&IDs, "Monday Review" • Coordinator of the Fire-Proofing Workshop to define the scope of fireproofing at the beginning of the Project. • Channel and activate the Technical Clarifications to be made with the Client, Licensors and/or Vendors and Subcontractors in his area of responsibility. • Promote the optimization of designs and coordinate the consistency analysis of Engineering in their area of responsibility. • Ensure consistency of engineering drawings in his area of responsibility • Participate in meetings to launch orders to Vendors (KOM) and confirm compliance with the VDDL, spare parts, preservation requirements, IT requirements, services (training) and/or technical assistance on site, as well as analyze and minimize deviations. • Participate in the Constructability meetings (convened by the Construction Constructability Department), ensuring the participation of the Engineering disciplines and the implementation, both in Engineering and Procurement, of the approved proposals. • Manage and coordinate, together with the Project Management, in the taking of action for the resolution of the OS&Ds opened by Construction to the reception of materials and serve as a link between the Procurement and Construction Departments. • Ensure continuity between engineering and construction. • Coordinate the production and management of "As Built" plans. • Review of project Risk register, Planning of commissioning process, Mechanical completion, Examination of P&ID, Pre-Commissioning of system, component or equipment, Commissioning, Pre-Startup Safety Review (PSSR), Plant Startup, • Assist and support the Project Area Manager / Engineering Manager, assuming his role when appointed, in meetings with the Client's representative for: P&ID reviews, design, 3D model, constructability, HAZOP, HSE, commissioning, etc. and officially document them. • Support the Engineering Manager in the analysis and monitoring of Project Change Management (NdCs) as indicated in company procedures, activating the affected disciplines to carry out the activities required in the "Notification of Changes" application, prioritizing potential change orders. • Assist and support the Project Area Manager / Engineering Manager in the registration of engineering change control (Management of Changes (MoC)) according to the scope of the Contract. • Assist the Project Area Manager / Engineering Manager to promote and encourage the initiatives of cost reduction plans and acceleration of the activity program. • Assist the Project Area Manager / Engineering Manager in the preparation of the periodic Project progress report in relation to his area of responsibility. Previous Employer : Petron Engineering at India From To Project / Position / Relevant Technical and Management Experience Jan. 1998 Feb. 2000 Project : Reliance Industries Crude oil refinery Project Client : Position : Piping Engineer Responsibility : • Supervision on piping erection & installation work and coordinate with execution team like, supervisor, foreman, of all aspect. • Checks and reviews isometric drawing weld mapping to ensure easy shop fabrication, handling and site installation. • Proper check fit up, Overlap of joint, spools dimension, • Take up spools support from spools yard as per weekly planning of spools erection. • Proper check latest revision drawing use on site. • Proper follow approved code and standard. • Preparation internal scheduling for weekly, monthly work. And arrange the resource & manpower. • Make sure timely approval of PTW on site. • Coordinate to Civil, steel structure section and make sure work front for piping work. • Implement the safe work manner on site. • Planning of weekly monthly and arrange Pipes spools, Supports, on site according to planning, • Coordinate to fabrication shop to fabricate the spools and support according to prioritization. • Enrolled the manpower for safety induction training and others confined space entry, work at height, fire watcher. • Attend toolbox meeting and proper explain task, Hazard and risk. • Coordinate to Engineering department to solve drawing issues and line clash, • Prepare As built sketch and submit to engineering department and update data base. • Proper implement the HSE and other. • Attend the “A” Punch point and ready the test package for hydro test. • Attend the “B” Punch point and closed the test package. Personal Particulars: Name : Afzal Ansari Name : Afzal Ansari Nationality : India Father’s Name : Mr. Idris Ansari Date of Bir : 02/07/1976 Marital Status : Married Passport Details Passport Number : S4271753 Date of Issued : 05/10/2018 Date of Expired : 04/10/2028 Place of Issued : Patna Country : India
Education:
Bachelor Degree in mechanical
Skills:
Construction Manager Oil and gas petrochemical
Language skills:
-
Additionally:
Project Manager
Chat

Login or register to leave comments.

Recently added resumes.
s
Computer

Muhammad Umar Farooq

1500 $

Pakistan

an hour ago

Construction

JAYAKRISHNAN J

1000 $

Canada

5 hours ago

K
Aerospace engineer

Khush Bakhat Sawaiba

8000 AED

UAE

6 hours ago

Similar resumes.
s
Computer

Muhammad Umar Farooq

1500 $

Pakistan

an hour ago

Construction

JAYAKRISHNAN J

1000 $

Canada

5 hours ago

K
Aerospace engineer

Khush Bakhat Sawaiba

8000 AED

UAE

6 hours ago

Don't miss out on vacancies abroad

Subscribe to our telegram channel @layboard_in

Don't miss out on vacancies abroad

Subscribe to our telegram channel @layboard_in